Modern magnetic quality monitoring and the forecast of the technical condition of engineering constructions

Authors:
A. N. Lyubchik
About authors
  • Postgraduate student Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-08-15
Date accepted:
2009-10-19
Date published:
2010-02-01

Abstract

On terrain of Russia act a system of mains by a general expansion more than 200 thousand km. More than halves oil and gas pipelines are in exploitation 25-35 years, i.e. demand immediate repeated examination and conforming preventive maintenance. Intraube magnetic or the ultrasonic flaw detection for these purposes is not always possible and is dear enough, therefore last years a urgency of application of remote geophysical methods has increased at service oil and gaspipeline of the transport sharply. These methods are express enough and more economic.

Область исследования:
(Archived) Geotechnical engineering, powerengineering and automation
Keywords:
the underground pipeline magnetic method intratrumpet diagnostics a shelldefektoskop a method of magnetic memory of metal
Go to volume 186

References

  1. Intratrumpet diagnostics of the main pipelines. URL: www.intron.ru/?section=development&page=79〈=ru
  2. Krapivskij E.I., Demchenko N.P. Geophysical methods of diagnostics of a technical condition of underground pipelines: the Manual Ukhta: UGTU, 2002, 101 р.
  3. Ljubchik A.N, Belikov A.A., KrapivskyE.I. Research of magnetic fields of pipelines gradiometer for the purpose of the control of their technical condition. Problems of de- velopment of bowels in the XXI-st century eyes of the young: Materials 5 International scientific schools of young scientists and experts. On November, 11-14th 2008 г. Моз- cow: URANIUM IPKON the Russian Academy of Sciences, 2008. P.350-353.

Similar articles

Geomechanical substantiation of parameters of the fastening of railway tunnels in the conditions of the North Caucasus
2010 N. A. Belyakov
Peculiarity of economic investment at gold ore deposit
2010 P. A. Zhigulevich
Complex geological engineering and geoenvironmental monitoring as a basis for creation of strategy of Saint Petersburg architectural and historical monuments conservation
2010 A. V. Shidlovskaya
The phenomenon of spontaneous termination of the discharge current and the establishment of fully-managed key elements of the plasma
2010 A. S. Mustafaev, S. A. Vysotskii, M. A. Cherkasova, M. A. Mamelkina
Selection of optimal scheme of a reclamation of mining damp of the open-cast «Mejdyrechensky»
2010 I. R. Levchuk
Reducing losses ore between whole chamber for the design of lower layers mine by Gubkin of open joint-stock company «Industrial complex KMAruda»
2010 E. I. Boguslavskiy, P. V. Korzhavykh