Abstract

At definition of benches height many features and factors are taken into consideration: conditions of burial and property of taken out rocks; necessary intensity of mining work; the planned schedule of strippings; demanded quality given out, from mineral opencast; parametres of drilling-and-blastings; working conditions of excavators and a condition of transportation of ore. The basic condition of correctly chosen bench height is its stability in the course of operation the opencast mine providing safety of conducting of mining operations.

Keywords:
bench height economic efficiency complex of open-cut equipment
Go to volume 186

References

  1. Арсентьев А.И. Проектирование горных работ при открытой разработке месторождений / А.И.Арсентьев, Г.А.Холодняков. М.: Недра, 1994. 496 с.

Similar articles

Study of the opening of copper presence electrolytic slimes of the copper production
2010 S. A. Modestova
The unit for gravity concentration of fine particles
2010 Ya. V. Kuskova
Control system for waste treatment of metallurgical works with use of membrane methods
2010 R. D. Pavlov
The North African campaign and its role in the World War II
2010 O. O. Tikhonov, K. V. Fedorov, O. Yu. Plenkov
The influence of change in geotechnical engineering and geoenvironmental conditions during the process of building and operation of constructions of projected Alekseevsky cement factory on their stability (Mordovia Republic)
2010 K. V. Pankratova
Estimation of stresses in system «massive – support – shaft drift» at dynamic loadings
2010 I. E. Dolgiy, D. A. Kotikov