Stress condition of prefabricated tunnel linning with initial release
Authors:
About authors
- the head of studying-computer centre Saint Petersburg State Mining Institute (Technical University)
Abstract
3d finite element model of soil and prefabricated tunnel lining interaction with appropriate boundary condition is given in this article. Stresses distribution on inner and outer part of the tunnel lining is analyzed. Relationship between stress state at top and sides of the tunnel lining and deformation module magnitude is shown.
Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
References
- Bulichev N.S., Amusin B.Z., Olovianni A.G. Permanent tunnel lining design. Moscow: Nedra, 1974. 320 p.
- Bulichev N.S., Fotieva N.N., Strelcov E.V. Structural design of permanent tunnel lining. Moscow: Nedra, 1986. 288 p.
- Protosena A.G., Lebedev M.O. Problem definition of structural analysis of stress and strain state around excavation. SPMI, SPb, 1999. Р.115-118
Similar articles
Geomechanical and geodynamic problems ассompanying the мining of hydrocarbon deposits
2010 Yu. A. Kashnikov, S. G. Ashikhmin, S. V. Gladyshev, S. N. Popov
Modeling of the volumetric stress-strain condition of the rock massive in the near mine which are crossing zone of weakening
2010 A. G. Protosenya, D. N. Petrov, M. G. Popov
Typization of coalbed-methane deposits оf the kuznetsk basin by promising methane output with using different technologies of gas recovery intensification of coal seams
2010 N. M. Storonskii, V. T. Khryukin, E. V. Shvachko, A. N. Vasilev, A. V. Kirilchenko, N. S. Malinina, D. V. Mitronov