Stress condition of prefabricated tunnel linning with initial release
Authors:
About authors
- the head of studying-computer centre Saint Petersburg State Mining Institute (Technical University)
Abstract
3d finite element model of soil and prefabricated tunnel lining interaction with appropriate boundary condition is given in this article. Stresses distribution on inner and outer part of the tunnel lining is analyzed. Relationship between stress state at top and sides of the tunnel lining and deformation module magnitude is shown.
Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
References
- Bulichev N.S., Amusin B.Z., Olovianni A.G. Permanent tunnel lining design. Moscow: Nedra, 1974. 320 p.
- Bulichev N.S., Fotieva N.N., Strelcov E.V. Structural design of permanent tunnel lining. Moscow: Nedra, 1986. 288 p.
- Protosena A.G., Lebedev M.O. Problem definition of structural analysis of stress and strain state around excavation. SPMI, SPb, 1999. Р.115-118
Similar articles
Change in presentations on mechanism of rock and tectonic bursts at ore mines at present time
2010 A. V. Lovchikov
Typization of coalbed-methane deposits оf the kuznetsk basin by promising methane output with using different technologies of gas recovery intensification of coal seams
2010 N. M. Storonskii, V. T. Khryukin, E. V. Shvachko, A. N. Vasilev, A. V. Kirilchenko, N. S. Malinina, D. V. Mitronov
Geoecological monitoring as an information base of accident-free operation of gas mains under conditions of the Far North
2010 N. B. Pystina, A. V. Baranov
Particular formation of higher rock pressure zones with intensive mining of contiguous seams at coal mines of the «Suek-Kuzbass» CO
2010 A. I. Paltsev, V. V. Zubkov, N. V. Krotov