Submit an Article
Become a reviewer
Vol 188
Pages:
133-137
Download volume:
RUS
Article

Stress condition of prefabricated tunnel linning with initial release

Authors:
E. A. Karasev
About authors
  • the head of studying-computer centre Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-09
Date accepted:
2009-12-12
Date published:
2010-09-22

Abstract

3d finite element model of soil and prefabricated tunnel lining interaction with appropriate boundary condition is given in this article. Stresses distribution on inner and outer part of the tunnel lining is analyzed. Relationship between stress state at top and sides of the tunnel lining and deformation module magnitude is shown.

Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
tunnel lining stress model numerical method
Funding:

None

Go to volume 188

References

  1. Bulichev N.S., Amusin B.Z., Olovianni A.G. Permanent tunnel lining design. Moscow: Nedra, 1974. 320 p.
  2. Bulichev N.S., Fotieva N.N., Strelcov E.V. Structural design of permanent tunnel lining. Moscow: Nedra, 1986. 288 p.
  3. Protosena A.G., Lebedev M.O. Problem definition of structural analysis of stress and strain state around excavation. SPMI, SPb, 1999. Р.115-118

Similar articles

Modeling of the volumetric stress-strain condition of the rock massive in the near mine which are crossing zone of weakening
2010 A. G. Protosenya, D. N. Petrov, M. G. Popov
Types and mechanisms of geodynamic hazard in mineral deposits mining and exploitation of buried and surface engineer constructions
2010 A. N. Shabarov
Geomechanical foundations of the safe extraction in joint mining of rich, coppery and ore patches in deep ore mines at Тalnakh
2010 V. A. Zvezdkin, A. A. Andreev
Geodynamic model of hydrogen sulphide’s formation in natural gas and oil in the process of rocks impulsive compression under conditions оf earthquakes
2010 A. V. Petukhov
Assessment of the role of geodynamic factor in the accident rate of pipeline systems
2010 E. K. Melnikov, A. N. Shabarov
Prediction of geodynamic processes in exploitation of the rockburst-dangerous North-Urals bauxite deposit
2010 D. V. Sidorov, O. B. Shonin