Stress condition of prefabricated tunnel linning with initial release
Authors:
About authors
- the head of studying-computer centre Saint Petersburg State Mining Institute (Technical University)
Abstract
3d finite element model of soil and prefabricated tunnel lining interaction with appropriate boundary condition is given in this article. Stresses distribution on inner and outer part of the tunnel lining is analyzed. Relationship between stress state at top and sides of the tunnel lining and deformation module magnitude is shown.
Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Funding:
None
References
- Bulichev N.S., Amusin B.Z., Olovianni A.G. Permanent tunnel lining design. Moscow: Nedra, 1974. 320 p.
- Bulichev N.S., Fotieva N.N., Strelcov E.V. Structural design of permanent tunnel lining. Moscow: Nedra, 1986. 288 p.
- Protosena A.G., Lebedev M.O. Problem definition of structural analysis of stress and strain state around excavation. SPMI, SPb, 1999. Р.115-118
Similar articles
Methods and techniques for control of rockburst-hazard in underground mining at ore mines of the Far-East district
2010 I. Yu. Rasskazov, G. A. Kalinov, V. I. Miroshnikov, D. S. Migunov, A. Yu. Iskra, P. A. Anikin
Influence of blocky-hierarchy structure of geological medium on the forming of natural and technogenic geodynamic fields in the North-West part of the Amur geoblock
2010 I. Yu. Rasskazov, B. G. Saksin
Providing of safe conditions for mining of shaftbottom protective pillars in deep ore mines at Тalnakh
2010 V. A. Zvezdkin, A. G. Anokhin, R. B. Galaov