Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-14
Date accepted:
2009-12-07
Date published:
2010-09-22

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
rock bursts coal pillars yielding pillars
Funding:

None

Go to volume 188

Similar articles

Control of rock mass state in mining the sections at mines оf the Vorkutaugol JST: up-to-date practice
2010 O. V. Yamenko, I. E. Plisko
Preconditions for prediction of technogenic seismic activity by cycles of objects of the solar system
2010 B. G. Tarasov, A. G. Olovianny, L. V. Bugaenko
Principal technologies for prevention of natural dangers at coal mines
2010 Jozef Dubinsky
Preventive measures of gas-dynamic phenomena in the workings drivage on the rockburst- outburst-hazardous seams under extremely complicated geological and mining conditions
2010 V. P. Kostromin
Systematization of factors to be considered in mine abandonment design
2010 S. P. Reshetnyak, Yu. V. Fedotova, V. V. Doroshenko
The analysis of factors, that cause processes of open hole wells’ destructions of Gatchina underground gas storage reservoir and prediction of sand effects
2010 D. V. Grishin, A. V. Petukhov, A. A. Petukhov