Submit an Article
Become a reviewer
Vol 188
Pages:
125-126
Download volume:
RUS
Article

Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-14
Date accepted:
2009-12-07
Date published:
2010-09-22

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
rock bursts coal pillars yielding pillars
Go to volume 188

Similar articles

The problems of efficient use of the tumenian reservoirs at final stage of low-pressure gas production and prospects in their solutions
2010 O. E. Bugriy
Modeling of geomechanical processes in mining the steeply pitching ore bodies of rockburst-hazardous deposits
2010 I. Yu. Rasskazov, M. I. Rasskazova, V. I. Miroshnikov, B. G. Saksin
Investigation of present-day stress-strain state of rock mass by the results of observations at geodynamic polygons
2010 S. N. Savchenko, E. V. Kasparyan, Yu. G. Smagina
Regularities of progressing of technogenic seismic activity in mining areas
2010 S. V. Tsirel
Types and mechanisms of geodynamic hazard in mineral deposits mining and exploitation of buried and surface engineer constructions
2010 A. N. Shabarov
Prediction of geodynamic processes in exploitation of the rockburst-dangerous North-Urals bauxite deposit
2010 D. V. Sidorov, O. B. Shonin