Submit an Article
Become a reviewer
Vol 188
Pages:
125-126
Download volume:
RUS
Article

Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-14
Date accepted:
2009-12-07
Date published:
2010-09-22

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
rock bursts coal pillars yielding pillars
Funding:

None

Go to volume 188

Similar articles

Stress condition of prefabricated tunnel linning with initial release
2010 E. A. Karasev
Specific manifestations of tectonic and seismic activity in Kuzbass
2010 A. I. Ekimov, S. V. Tsirel
Scientific-methodical foundation for geodynamic safety of oil and gas objects
2010 Yu. O. Kuzmin
Geomechanical foundations of the safe extraction in joint mining of rich, coppery and ore patches in deep ore mines at Тalnakh
2010 V. A. Zvezdkin, A. A. Andreev
Some geomechanical aspects in the development of calculation methods of rock pressure in permanent mine workings
2010 A. M. Kozel
Prediction of geodynamic processes in exploitation of the rockburst-dangerous North-Urals bauxite deposit
2010 D. V. Sidorov, O. B. Shonin