Determination of coal pillar sizes in preparation of seams with paired mine workings
About authors
- 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
- 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
- 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Abstract
The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.
Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Similar articles
Preventive measures of gas-dynamic phenomena in the workings drivage on the rockburst- outburst-hazardous seams under extremely complicated geological and mining conditions
2010 V. P. Kostromin
Particular formation of higher rock pressure zones with intensive mining of contiguous seams at coal mines of the «Suek-Kuzbass» CO
2010 A. I. Paltsev, V. V. Zubkov, N. V. Krotov
Control of dynamic rock pressure manifestations in mining the «Antey» deposit
2010 I. Yu. Rasskazov, G. A. Kursakin, B. G. Saksin, A. A. Filinkov, V. S. Svyatetskii, B. A. Prosekin
The problems of efficient use of the tumenian reservoirs at final stage of low-pressure gas production and prospects in their solutions
2010 O. E. Bugriy