Submit an Article
Become a reviewer
Vol 188
Pages:
125-126
Download volume:
RUS
Article

Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-14
Date accepted:
2009-12-07
Date published:
2010-09-22

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
rock bursts coal pillars yielding pillars
Funding:

None

Go to volume 188

Similar articles

Prediction of geodynamic processes in exploitation of the rockburst-dangerous North-Urals bauxite deposit
2010 D. V. Sidorov, O. B. Shonin
Change in presentations on mechanism of rock and tectonic bursts at ore mines at present time
2010 A. V. Lovchikov
Regularities of progressing of technogenic seismic activity in mining areas
2010 S. V. Tsirel
Monitoring of deformation processes of the earth surface with methods of differential interferometric treatment of radar data
2010 A. A. Krivenko, Yu. A. Kashnikov
Providing of safe conditions for mining of shaftbottom protective pillars in deep ore mines at Тalnakh
2010 V. A. Zvezdkin, A. G. Anokhin, R. B. Galaov
Assessment of the role of geodynamic factor in the accident rate of pipeline systems
2010 E. K. Melnikov, A. N. Shabarov