Submit an Article
Become a reviewer
Vol 188
Pages:
125-126
Download volume:
RUS
Article

Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-14
Date accepted:
2009-12-07
Date published:
2010-09-22

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
rock bursts coal pillars yielding pillars
Funding:

None

Go to volume 188

Similar articles

Geomechanical and geodynamic problems ассompanying the мining of hydrocarbon deposits
2010 Yu. A. Kashnikov, S. G. Ashikhmin, S. V. Gladyshev, S. N. Popov
Modeling of geomechanical processes and their geophysical control in coal strata mining
2010 V. V. Zubkov, I. A. Zubkova
Aspects in geomechanics and safety in exploration of solid mineral deposits
2010 A. I. Perepelitsyn
Geomechanical substantiation of projects of ore deposits mining
2010 V. V. Zubkov, A. A. Filinkov
Monitoring of deformation processes of the earth surface with methods of differential interferometric treatment of radar data
2010 A. A. Krivenko, Yu. A. Kashnikov
Control of rock mass state in mining the sections at mines оf the Vorkutaugol JST: up-to-date practice
2010 O. V. Yamenko, I. E. Plisko