Determination of coal pillar sizes in preparation of seams with paired mine workings
About authors
- 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
- 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
- 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Abstract
The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.
Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Funding:
None
Similar articles
Geomechanical and geodynamic problems ассompanying the мining of hydrocarbon deposits
2010 Yu. A. Kashnikov, S. G. Ashikhmin, S. V. Gladyshev, S. N. Popov
Modeling of geomechanical processes and their geophysical control in coal strata mining
2010 V. V. Zubkov, I. A. Zubkova