Submit an Article
Become a reviewer
Vol 188
Pages:
125-126
Download volume:
RUS
Article

Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-14
Date accepted:
2009-12-07
Date published:
2010-09-22

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
rock bursts coal pillars yielding pillars
Go to volume 188

Similar articles

Regularities of progressing of technogenic seismic activity in mining areas
2010 S. V. Tsirel
Influence of blocky-hierarchy structure of geological medium on the forming of natural and technogenic geodynamic fields in the North-West part of the Amur geoblock
2010 I. Yu. Rasskazov, B. G. Saksin
Modeling of geomechanical processes in mining the steeply pitching ore bodies of rockburst-hazardous deposits
2010 I. Yu. Rasskazov, M. I. Rasskazova, V. I. Miroshnikov, B. G. Saksin
Providing of safe conditions for mining of shaftbottom protective pillars in deep ore mines at Тalnakh
2010 V. A. Zvezdkin, A. G. Anokhin, R. B. Galaov
Geotechnical monitoring in cryolite zone. Ecological or industrial safety
2010 A. P. Popov
Preconditions for prediction of technogenic seismic activity by cycles of objects of the solar system
2010 B. G. Tarasov, A. G. Olovianny, L. V. Bugaenko