Submit an Article
Become a reviewer
Vol 188
Pages:
125-126
Download volume:
RUS
Article

Determination of coal pillar sizes in preparation of seams with paired mine workings

Authors:
N. V. Krotov1
F. P. Ivchenko2
D. V. Sidorov3
About authors
  • 1 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D. leading research assistant Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-10-14
Date accepted:
2009-12-07
Date published:
2010-09-22

Abstract

The results of introduction at coal mines of the methods for determination of coal pillar sizes in preparation of rockburst-hazardous seams with paired workings are discussed in the paper. Safe values of advancing in drivage of development workings with formation of yielding have been established.

Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Keywords:
rock bursts coal pillars yielding pillars
Funding:

None

Go to volume 188

Similar articles

Assessment of the role of geodynamic factor in the accident rate of pipeline systems
2010 E. K. Melnikov, A. N. Shabarov
Specific manifestations of tectonic and seismic activity in Kuzbass
2010 A. I. Ekimov, S. V. Tsirel
Preconditions for prediction of technogenic seismic activity by cycles of objects of the solar system
2010 B. G. Tarasov, A. G. Olovianny, L. V. Bugaenko
Control of rock mass state in mining the sections at mines оf the Vorkutaugol JST: up-to-date practice
2010 O. V. Yamenko, I. E. Plisko
Aspects in geomechanics and safety in exploration of solid mineral deposits
2010 A. I. Perepelitsyn
Systematization of factors to be considered in mine abandonment design
2010 S. P. Reshetnyak, Yu. V. Fedotova, V. V. Doroshenko