Geomechanical substantiation of projects of ore deposits mining
About authors
- 1 — Ph.D., Dr.Sci. chief research assistant Saint Petersburg State Mining Institute (Technical University)
- 2 — Ph.D. laboratory head Saint Petersburg State Mining Institute (Technical University)
Abstract
The paper presents the monitoring system for better geodynamic safety in mining of mineral deposits. The suggested system of geodynamic monitoring allows us to evaluate the stress state of ore massif for the planned variant of mining and to give recommendations on the safe deposit mining. Based on the analysis of the modeling data, consideration was given to one of the variants of geomechanical substantiation of the project of ore deposit mining.
Область исследования:
(Archived) Problems in geodynamic safety in the exploration of solid deposits
Similar articles
Particular formation of higher rock pressure zones with intensive mining of contiguous seams at coal mines of the «Suek-Kuzbass» CO
2010 A. I. Paltsev, V. V. Zubkov, N. V. Krotov
Some geomechanical aspects in the development of calculation methods of rock pressure in permanent mine workings
2010 A. M. Kozel
Geomechanical and geodynamic problems ассompanying the мining of hydrocarbon deposits
2010 Yu. A. Kashnikov, S. G. Ashikhmin, S. V. Gladyshev, S. N. Popov