Substantiation of way unloading pillar in tectonically fractured massif

Authors:
A. G. Protosenya1
D. Yu. Dorzhiev2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-07-11
Date accepted:
2010-09-02
Date published:
2011-03-21

Abstract

Simulation-based finite element method of forming the features of the stress-strain state in pillar at the ore body downstream horizontal layers with a mined-out space. The obtained regularities of redistribution of stresses in pillar and surrounding rock massif are allowed to substantiate an effective way to reduce the bump hazard in mining  operations.

Go to volume 189

References

  1. Поляков А.Н. Прогноз удароопасности горнотехнических ситуаций на перспективные глубины разработки // Горный журнал. 1993. № 4. С. 51-56.
  2. Расчетные методы в механике горных ударов и выбросов: Справочное пособие / И.М.Петухов, А.М.Линьков, В.С.Сидоров и др. / М.: Недра, 1992. 256 с.

Similar articles

Selection of parameters camouflet blasting to reduce bump hazard by development uranium deposits
2011 D. Yu. Dordzhiev
Distribution of products of destruction of granite files
2011 G. P. Paramonov, Yu. I. Vinogradov, A. A. Kamenskiy
Mass-transfer and the crystallization stream at decomposition of aluminate solutions
2011 D. A. Kremcheeva, V. N. Brichkin
Parameters of underground operations in combined mining of kimberlite deposits
2011 G. F. Piven
Substantiation of pumped volumes of flow angularity compositions in injection wells
2011 A. R. Mavliev, M. K. Rogachev, D. V. Mardashov
Modern technology concentration platinum metals from industrial waste by processing of sulphide copper-nickel ores
2011 V. N. Kovalev