Substantiation of way unloading pillar in tectonically fractured massif
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
Abstract
Simulation-based finite element method of forming the features of the stress-strain state in pillar at the ore body downstream horizontal layers with a mined-out space. The obtained regularities of redistribution of stresses in pillar and surrounding rock massif are allowed to substantiate an effective way to reduce the bump hazard in mining operations.
References
- Поляков А.Н. Прогноз удароопасности горнотехнических ситуаций на перспективные глубины разработки // Горный журнал. 1993. № 4. С. 51-56.
- Расчетные методы в механике горных ударов и выбросов: Справочное пособие / И.М.Петухов, А.М.Линьков, В.С.Сидоров и др. / М.: Недра, 1992. 256 с.
Similar articles
Reduction methods of high harmonics influence on the electric equipment operation
2011 Ya. E. Shklyarskii, A. N. Skamin
Ingineering geological problems of high-rise construction with underground space development in Saint-Petersburg
2011 R. E. Dashko, A. M. Zhukova