Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
- 3 — Saint Petersburg State Mining Institute (Technical University)
- 4 — Saint Petersburg State Mining Institute (Technical University)
Abstract
Mining systems for ore bodies of different thickness are developed for the conditions of Cholodninskoe deposit. Ration parameters of mining system are determined.
Область исследования:
(Archived) Mine survey
Funding:
None
Similar articles
Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport
2011 V. V. Ivanov
Perfection of the mine servey and geological maintenance of technology of open mountain works
2011 R. A. Takranov
Stabilization of development workings in overworked layers
2011 A. A. Sidorenko, S. A. Sidorenko, O. V. Trushko
Technological advancement of gold heap leaching geotechnology with cryogenic ore desintegration
2011 S. B. Tataurov