Submit an Article
Become a reviewer
Vol 190
Pages:
197
Download volume:
RUS
Article

Designing support unilateral rectangular interfase of horizontal developments

Authors:
Yu. N. Ogorodnikov1
V. I. Ochkurov2
D. N. Petrov3
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
  • 3 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-07
Date accepted:
2010-10-13
Date published:
2011-04-05

Abstract

The design procedure of loadings on arch support unilateral rectangular interfaces in an ore file of Jakovlevsky deposit КМА is offered. The settlement scheme corresponds rigid and plastic model of deformation of an ore file in a roof of interfaces. A major factor defining size of loading on overlappings of interfaces, emptiness in a roof after filling there are. Low efficiency of flat overlappings of interfaces on chamber frames and advantages of overlappings of interfaces by arches from profile SVP with horizontal couplers from арматурной steels of armature was revealed. Possibility of operative calculation of loadings and a choice of parametres of overlappings on conditions of durability and stability of bearing elements of support in ores of various types is proved.

Область исследования:
(Archived) Geomechanics
Funding:

None

Go to volume 190

Similar articles

Investigation of exfoliation height of roof rocks in mine workings within the zone of bearing pressure
2011 M. A. Rozenbaum, S. M. Chernyakhovskii, E. S. Savchenko
Determination of maximum roof spans in the intensive mining of flat-lying coal seams at the Kuzbass basin
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov
Substantiation of rational mining parameters for iv potash horizon of the starobin potash deposit
2011 O. V. Kovalev, S. P. Mozer, I. Yu. Mozer, A. V. Leisle
Development of tecnological shemes of the selective extraction of the complex potash seams under conditions of the starobin deposit
2011 O. V. Kovalev, E. R. Kovalskii, Yu. G. Sirenko, I. Yu. Tkhorikov
The method of planning of stockpiles laser scanner mine surveying
2011 E. A. Nesterenko
Justification of gold heap cryoleaching geotechnology
2011 S. B. Tataurov