Submit an Article
Become a reviewer
Vol 190
Pages:
138
Download volume:

Technology of kimberlitic tubes underquarry deposits mining in complex hydro-geological conditions

Authors:
M. N. Andreev1
E. I. Boguslavskii2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technisal University)
  • 2 — Saint Petersburg State Mining Institute (Technisal University)
Date submitted:
2010-08-13
Date accepted:
2010-10-11
Date published:
2011-02-01

Abstract

Article is in touch with mining industry and devoted to the analysis and generalisation of world experience of underground mining of kimberlitic tubes underquarry reserves. In it the urgency of research of new technologies of underground mining of kimberlitic tubes underquarry reserves in the conditions of the deposits, developed by «ALROSA» stock company is formulated and basic problems arising in this area are defined. The mining technology of kimberlitic tubes water-bearing underquarry reserves excavation is described.

Go to volume 190

References

  1. Айнбиндер И.И. К проблеме отработки подкарьерных запасов трубки «Мир» подземным способом / И.И.Айнбиндер, Н.П.Крамсков // Горный журнал. 2000. № 8.
  2. Замесов Н.Ф. Технические решения по ускоренному вскрытию и подготовке к эксплуатации подкарьерных запасов трубки «Мир» // Горный журнал. 2000. № 2.
  3. Калитин В.Т. Алмазодобывающий комплекс России: современное состояние, проблемы и перспективы развития // Горный журнал. 2003. № 1.
  4. Комбинированная геотехнология при освоении алмазоносного месторождения трубки «Удачная» / Д.Р.Каплунов, М.В.Рыльникова, В.В.Калмыков, Ю.А.Петров, В.А.Суслов // Горная промышленность. 2005. № 4.
  5. Осинцев В.А. Комплексный открыто-подземный способ разработки рудных месторождений с крутыми нерабочими бортами карьера // Горный журнал. Известия вузов. 2005. № 3.

Similar articles

Technogenic transformation of the basic components of megacities underground space and its account in geomechanical calculations (on the example of Saint Petersburg)
2011 R. E. Dashko, A. V. Shidlovskaya, K. V. Pankratova, A. M. Zhukova
Metal pliable support developmentsin an ore file Yakovlevsky mine
2011 V. I. Ochkurov, Yu. N. Ogorodnikov, Yu. N. Antonov
Substantiation of rational mining parameters for iv potash horizon of the starobin potash deposit
2011 O. V. Kovalev, S. P. Mozer, I. Yu. Mozer, A. V. Leisle
Qiuck-acting technique for the determination of rheological properties of rocks
2011 M. D. Ilinov, Yu. M. Kartashov
Assessment of geodynamic and geomechanical conditions in the mining of ore bodies of near-ore bank reserves at the Koashva open-pit mine
2011 V. V. Zubkov, I. A. Zubkova, G. V. Leontev, A. G. Zileev
Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh
2011 V. A. Zvezdkin, V. N. Karelin, A. G. Anokhin, Yu. N. Nagovitsin