Estimation methods of ore storage’s capacity for opencast startup time
About authors
- 1 — Saint Petersburg State Mining Institute (Technical University)
- 2 — Saint Petersburg State Mining Institute (Technical University)
Abstract
It is considered the technique of definition of ore warehouse’s capacity for the period of opencast development. This period is characterized by non-uniform opencast’s productivity on a mineral. The technique allows to estimate an initial ore warehouse’s stock, which is necessary for concentrating factory’s stable work, the possible moment of factory’s starting, and also dynamics of ore’s stocks at warehouse during period under review mining enterprise work.
References
- Буянов Ю.Д. Определение емкости промежуточных складов дробильно-сортировочных заводов // Строительные материалы. 1977. № 2.
- Васильев М.В. Внутрикарьерное складирование и перерузка руд. М.: Недра, 1968.
- Васильев М.В. Комбинированный транспорт на карьерах. М.: Недра, 1975.
- Истомин В.В. Установление вместимости перегрузочного пункта с учетом надежности работы погрузочно-транспортных комплексов оборудования // Горный информационно-аналитический бюллетень / МГГУ. М., 1993. Вып.7-8 (10-11).
Similar articles
Establishment of boundaries of hazardous zones in coal seam mining at mines of JSC «Suek-Kuzbass»
2011 N. V. Krotov, F. P. Ivchenko, A. P. Skakun, A. I. Paltsev
Assessment of geodynamic and geomechanical conditions in the mining of ore bodies of near-ore bank reserves at the Koashva open-pit mine
2011 V. V. Zubkov, I. A. Zubkova, G. V. Leontev, A. G. Zileev
Aspects of coal strata mining at the mine of the elegest deposit (the republic of Tyva)
2011 Yu. V. Gromov, D. N. Demekhin
Geodinamical variability as a cause of natural disasters and technogenic catastrophes
2011 L. K. Gorshkov, Z. B. Dekusar