Submit an Article
Become a reviewer
Vol 190
Pages:
56
Download volume:
RUS
Article

Estimation methods of ore storage’s capacity for opencast startup time

Authors:
G. A. Kholodnyakov1
M. M. Yakubovskii2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-21
Date accepted:
2010-10-11
Date published:
2011-04-05

Abstract

It is considered the technique of definition of ore warehouse’s capacity for the period of opencast development. This period is characterized by non-uniform opencast’s productivity on a mineral. The technique allows to estimate an initial ore warehouse’s stock, which is necessary for concentrating factory’s stable work, the possible moment of factory’s starting, and also dynamics of ore’s stocks at warehouse during period under review mining enterprise work.

Область исследования:
(Archived) Geotechnology
Go to volume 190

Similar articles

Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh
2011 V. A. Zvezdkin, V. N. Karelin, A. G. Anokhin, Yu. N. Nagovitsin
Dynamics of rock pressure manifestation in mining the flat-lying coal seams with heavy roofs
2011 S. G. Baranov, D. S. Vlasenko, M. A. Loginov
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
Geodinamical variability as a cause of natural disasters and technogenic catastrophes
2011 L. K. Gorshkov, Z. B. Dekusar
Providing of safe conditions for mining оf shaftbottom protective pillars in deep ore mines at Talnakh
2011 V. A. Zvezdkin, V. N. Karenin, A. G. Anokhin
Aspects of coal strata mining at the mine of the elegest deposit (the republic of Tyva)
2011 Yu. V. Gromov, D. N. Demekhin