Submit an Article
Become a reviewer
Vol 190
Pages:
56
Download volume:

Estimation methods of ore storage’s capacity for opencast startup time

Authors:
G. A. Kholodnyakov1
M. M. Yakubovskii2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-21
Date accepted:
2010-10-11
Date published:
2011-02-01

Abstract

It is considered the technique of definition of ore warehouse’s capacity for the period of opencast development. This period is characterized by non-uniform opencast’s productivity on a mineral. The technique allows to estimate an initial ore warehouse’s stock, which is necessary for concentrating factory’s stable work, the possible moment of factory’s starting, and also dynamics of ore’s stocks at warehouse during period under review mining enterprise work.

Go to volume 190

References

  1. Буянов Ю.Д. Определение емкости промежуточных складов дробильно-сортировочных заводов // Строительные материалы. 1977. № 2.
  2. Васильев М.В. Внутрикарьерное складирование и перерузка руд. М.: Недра, 1968.
  3. Васильев М.В. Комбинированный транспорт на карьерах. М.: Недра, 1975.
  4. Истомин В.В. Установление вместимости перегрузочного пункта с учетом надежности работы погрузочно-транспортных комплексов оборудования // Горный информационно-аналитический бюллетень / МГГУ. М., 1993. Вып.7-8 (10-11).

Similar articles

The engineering geological control of underground transport tunnels exploitation reliability in Saint Petersburg
2011 R. E. Dashko, P. V. Kotyukov
Development of tecnological shemes of the selective extraction of the complex potash seams under conditions of the starobin deposit
2011 O. V. Kovalev, E. R. Kovalskii, Yu. G. Sirenko, I. Yu. Tkhorikov
Stabilization of development workings in overworked layers
2011 A. A. Sidorenko, S. A. Sidorenko, O. V. Trushko
The method of planning of stockpiles laser scanner mine surveying
2011 E. A. Nesterenko
Establishment of boundaries of hazardous zones in coal seam mining at mines of JSC «Suek-Kuzbass»
2011 N. V. Krotov, F. P. Ivchenko, A. P. Skakun, A. I. Paltsev
Geomichanical justification of entries stability at development of nearboard reserves of Кoashva quarry with a roof fall of a disturbed pit wall
2011 Yu. N. Ogorodnikov, A. D. Kuranov