Submit an Article
Become a reviewer
Vol 190
Pages:
56
Download volume:
RUS
Article

Estimation methods of ore storage’s capacity for opencast startup time

Authors:
G. A. Kholodnyakov1
M. M. Yakubovskii2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-21
Date accepted:
2010-10-11
Date published:
2011-04-05

Abstract

It is considered the technique of definition of ore warehouse’s capacity for the period of opencast development. This period is characterized by non-uniform opencast’s productivity on a mineral. The technique allows to estimate an initial ore warehouse’s stock, which is necessary for concentrating factory’s stable work, the possible moment of factory’s starting, and also dynamics of ore’s stocks at warehouse during period under review mining enterprise work.

Область исследования:
(Archived) Geotechnology
Funding:

None

Go to volume 190

Similar articles

A new technique for the determination of ultimate strength in extention of rocks
2011 V. A. Korshunov, Yu. M. Kartashov
Management stress-strain state block structure partition arrays in difficult geological and mining engineering conditions of mine Тalnakh
2011 V. A. Zvezdkin, V. N. Karelin, A. G. Anokhin, Yu. N. Nagovitsin
Tunnel induced deformation of strata and formation of surface settlement trought during construction process
2011 M. A. Karasev
Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport
2011 V. V. Ivanov
Geodinamical variability as a cause of natural disasters and technogenic catastrophes
2011 L. K. Gorshkov, Z. B. Dekusar
Stress and strain state of strata before and after drainage
2011 D. N. Petrov