Submit an Article
Become a reviewer
Vol 190
Pages:
56
Download volume:
RUS
Article

Estimation methods of ore storage’s capacity for opencast startup time

Authors:
G. A. Kholodnyakov1
M. M. Yakubovskii2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-21
Date accepted:
2010-10-11
Date published:
2011-04-05

Abstract

It is considered the technique of definition of ore warehouse’s capacity for the period of opencast development. This period is characterized by non-uniform opencast’s productivity on a mineral. The technique allows to estimate an initial ore warehouse’s stock, which is necessary for concentrating factory’s stable work, the possible moment of factory’s starting, and also dynamics of ore’s stocks at warehouse during period under review mining enterprise work.

Область исследования:
(Archived) Geotechnology
Go to volume 190

Similar articles

Influence of a condition of a regional zone of a layer on the mechanism of occurrence of explosions of methane on collieries
2011 S. A. Tolstunov
Technological advancement of gold heap leaching geotechnology with cryogenic ore desintegration
2011 S. B. Tataurov
Perfection of the mine servey and geological maintenance of technology of open mountain works
2011 R. A. Takranov
Foundation of Cholodninskoye deposit mining systems in conditions of ecological risks
2011 V. P. Zubov, O. V. Mikhailenko, A. A. Antonov, M. D. Morozov
Open cast technological system with in-pit fully mobile crushing reliability avaluation
2011 S. I. Fomin, A. A. Faul, A. I. Ponomarev
Gamma fields dynamic dosage perfomances possibilities for diagnostics and control of radiation and nuclear accidents on nuclear power underground facilities group
2011 V. G. Kondratev