Submit an Article
Become a reviewer
Vol 190
Pages:
56
Download volume:
RUS
Article

Estimation methods of ore storage’s capacity for opencast startup time

Authors:
G. A. Kholodnyakov1
M. M. Yakubovskii2
About authors
  • 1 — Saint Petersburg State Mining Institute (Technical University)
  • 2 — Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2010-08-21
Date accepted:
2010-10-11
Date published:
2011-04-05

Abstract

It is considered the technique of definition of ore warehouse’s capacity for the period of opencast development. This period is characterized by non-uniform opencast’s productivity on a mineral. The technique allows to estimate an initial ore warehouse’s stock, which is necessary for concentrating factory’s stable work, the possible moment of factory’s starting, and also dynamics of ore’s stocks at warehouse during period under review mining enterprise work.

Область исследования:
(Archived) Geotechnology
Funding:

None

Go to volume 190

Similar articles

Perfection of the mine servey and geological maintenance of technology of open mountain works
2011 R. A. Takranov
Investigation of exfoliation height of roof rocks in mine workings within the zone of bearing pressure
2011 M. A. Rozenbaum, S. M. Chernyakhovskii, E. S. Savchenko
Assessment of geodynamic and geomechanical conditions in the mining of ore bodies of near-ore bank reserves at the Koashva open-pit mine
2011 V. V. Zubkov, I. A. Zubkova, G. V. Leontev, A. G. Zileev
Stabilization of development workings in overworked layers
2011 A. A. Sidorenko, S. A. Sidorenko, O. V. Trushko
Tunnel induced deformation of strata and formation of surface settlement trought during construction process
2011 M. A. Karasev
Open cast technological system with in-pit fully mobile crushing reliability avaluation
2011 S. I. Fomin, A. A. Faul, A. I. Ponomarev