Automation of two stadial grinding for example mineral separation plant GMK «Pechenganickel»
About authors
- 1 — Ph.D. associate professor Saint Petersburg State Mining University
- 2 — Ph.D. assistant lecturer Saint Petersburg State Mining University
- 3 — Ph.D. assistant lecturer Saint Petersburg State Mining University
Abstract
The algorithm and system optimal control of two-cycle by stages for mineral separation plant GMK «Pechenganickel». Computer modeling, which allows to determine the optimal set of optimization systems that implement the developed algorithm. A functional diagram of automation, allows the implementation algorithm and a system of optimal control.
Область исследования:
(Archived) Automation of technological processes аnd manufactures in mining and processing industries
References
- Andreev E.E., Tikhonov O.N. Crushing and preparation of raw material for enrichment: the Textbook; SPMI. SaintPetersburg,2007. 440.
- JKSimMet User Manual and Supplementary Information Manual // JKTech. Indooroopilly, Qld., Australia. 1989. Version 4. Release 1.
Similar articles
The new approach to control of the metallurgical limestone shaft kilning process
2011 N. I. Koteleva
Electrothermal complex with downhole electrosteam generator’s automation to aid in layer with high viscosity oil recovery
2011 E. A. Zagrivny, V. I. Malarev, V. O. Zyrin
The mathematical formulation of process оf decomposition alkaline solution kaolin
2011 O. A. Dubovikov, N. V. Nikolaeva
Prediction of the technical status of pipeline based on analysis
2011 A. N. Lubchik, E. I. Krapivsky, O. M. Bolshunova