Submit an Article
Become a reviewer
Vol 194
Pages:
167-172
Download volume:
RUS
Article

Application of the gpr-method for estimation of the condition of fastening of the backslope of soil dams

Authors:
V. V. Glazunov1
S. M. Danilev2
N. N. Efimova3
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — assistant lecturer Saint Petersburg State Mining University
  • 3 — Ph.D. senior research assistant «Sevmorgeo»
Date submitted:
2010-12-25
Date accepted:
2011-02-28
Date published:
2011-12-30

Abstract

The GPR-method showing high resolution, great performance and sensitivity to minor variations in the composition and conditions of soils and material has assumed a role of the leading geophysical method for looking at the upper part of the geological section. This paper presents the advanced directions of GPR prospecting for engineering problems solution.

Область исследования:
(Archived) Application of the modern geophysical technologies for prospecting and exploration of mineral deposits
Keywords:
GPR-method monitoring of engineering constructions condition of fastening of the backslope of soil dams cavities and zones softening of ground under reinforced concrete slab mathematical modelling
Go to volume 194

References

  1. Glazunov V.V., Efimova N.N., Shtengel V.G. GPR evaluation of the foundation soil of reinforced concrete units of hydraulic engineering structures // Not distruction metods world review. 2006. N 1 (31). P.18-21.
  2. Vladov M.L., Starovoytov A.V. Introduction in a georadar-location / Study guide. Moscow, 2004. 153 p.

Similar articles

Technology and management of yakutian kimberlitic tubes underquarry deposits mining at difficlult hydrogeological conditions
2011 Vladimir S. Litvinenko, E. I. Boguslavskii, M. N. Andreev
Phased strategy of drilling manufacture re-structuring and it's economy importance
2011 E. A. Krainova
Ultra wide band gpr-method: success and problems
2011 V. B. Boltintsev, V. N. Ilyakhin, K. P. Bezrodnyi
Technological fluids for increasing effectivity of construction and exploitation oil and gas wells
2011 Vladimir S. Litvinenko, N. I. Nikolaev
Application of electromagnetic pulse ultra wide band sounding on stage оf prospecting deposit of the oil shale in Jordan
2011 V. B. Boltintsev, V. N. Ilyakhin, R. M. Salikhov
New helicopter-borne time-domain airborne electromagnetic «Equator» system
2011 A. K. Volkovitskii, E. V. Karshakov, E. V. Moilanen