Determination of the rate of bunker filling screw executive authority and power to cut costs
About authors
- 1 — Ph.D. associate professor Saint Petersburg State Mining University
- 2 — Ph.D. associate professor Saint Petersburg State Mining University
- 3 — post-graduate student Saint Petersburg State Mining University
Abstract
Screw bunker executive body is designed to work on the peat deposits and can be used for the extraction of peat deposits from the drilling-out. The paper describes the design of screw bunker executive authority and proposed calculation of energy consumption for cutting.
Область исследования:
(Archived) Mining electromechanics and mining equipment
Funding:
None
References
- Batalov A.P. Calculation of loadings on walls of bunkers cylinder forms // Proceeding of mining Institute. Saint Petersburg, 2008. Т.178. P.31-34.
- Drilling tool for machine tool rotary buregiya // V.A.Peretolchin, N.N.Strabykin, Ya.N.Dolgun, Y.M.Koledin, E.V.Chudogashev, I.K.Vladimirtsev, J.P.Shemetov. Irkutsk, 1975. 204 p.
- Mihajlov A.V., Kremcheev E.A., Bolshunov A.V., Nagornov D.O. Perspektivy of development of new technologies of extraction of peat // Mining informational and analytical bulletin (scientific and technical journal). 2010. N 9. P. 191-192.
- Peretolchin V.A. The rotary drilling in quarries. Moscow, 1975. 128 p.
- Tikhonov N.V. Mining engineer. Moscow, 1960. 335 p.
- Filimonov N.A. Excavation and tunneling mining machines. Moscow, 1958. 428 p.
Similar articles
Specificity technological scheme development of the stocks on mine «Yakovlevsky»
2012 A. A. Antonov, M. D. Morozov, A. S. Malyutin
Optimization of pulse width modulation for multilevel converters of variable-frequency electric drive
2012 A. V. Kudryavtseva, O. B. Shonin
Environmental monitoring of the north ecosystems exposed to an impact of the mining
2012 A. V. Strizhenok
Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger
2012 G. A. Kholodnyakov, K. R. Argimbaev, S. P. Reshetnyak