Determination of the rate of bunker filling screw executive authority and power to cut costs

Authors:
E. A. Kremcheev1
A. V. Bolshunov2
D. O. Nagornov3
About authors
  • 1 — Ph.D. associate professor Saint Petersburg State Mining University
  • 2 — Ph.D. associate professor Saint Petersburg State Mining University
  • 3 — post-graduate student Saint Petersburg State Mining University
Date submitted:
2011-07-07
Date accepted:
2011-09-24
Date published:
2012-04-05

Abstract

Screw bunker executive body is designed to work on the peat deposits and can be used for the extraction of peat deposits from the drilling-out. The paper describes the design of screw bunker executive authority and proposed calculation of energy consumption for cutting.

Область исследования:
(Archived) Mining electromechanics and mining equipment
Keywords:
peat production the executive body drilling-out the power to cut
Funding:

None

Go to volume 195

References

  1. Batalov A.P. Calculation of loadings on walls of bunkers cylinder forms // Proceeding of mining Institute. Saint Petersburg, 2008. Т.178. P.31-34.
  2. Drilling tool for machine tool rotary buregiya // V.A.Peretolchin, N.N.Strabykin, Ya.N.Dolgun, Y.M.Koledin, E.V.Chudogashev, I.K.Vladimirtsev, J.P.Shemetov. Irkutsk, 1975. 204 p.
  3. Mihajlov A.V., Kremcheev E.A., Bolshunov A.V., Nagornov D.O. Perspektivy of development of new technologies of extraction of peat // Mining informational and analytical bulletin (scientific and technical journal). 2010. N 9. P. 191-192.
  4. Peretolchin V.A. The rotary drilling in quarries. Moscow, 1975. 128 p.
  5. Tikhonov N.V. Mining engineer. Moscow, 1960. 335 p.
  6. Filimonov N.A. Excavation and tunneling mining machines. Moscow, 1958. 428 p.

Similar articles

Features land recultivation, disturbed as a result of activities of dzhidinsky mining treatment complex
2012 S. I. Fomin, E. L. Ubugunov, V. A. Shevelev
Way remote magnitometrichesky control of the technical condition of the main pipelines
2012 A. N. Lyubchik
Analisys of surface water condition of the murmansk district which is exposed to a negative impact оf the mining-enrich industry
2012 V. A. Petrova, V. A. Rogalev
Approach to perfection and progress of the industrial infrastructure (on the example of the deposit «Glubokoe» on extraction of plaster in the Arkhangelsk area)
2012 V. A. Modyanova
Automatic adjustment of metrology performance meter random signal transducer analyzer liquid flows
2012 R. M. Proskuryakov, A. V. Kopteva, I. N. Voityuk
Measuring the continuity effect of plasma-pulse action on the rheological properties of heavy highly viscous oil
2012 A. A. Molchanov, A. V. Maksyutin, R. R. Khusainov