Determination of the rate of bunker filling screw executive authority and power to cut costs
About authors
- 1 — Ph.D. associate professor Saint Petersburg State Mining University
- 2 — Ph.D. associate professor Saint Petersburg State Mining University
- 3 — post-graduate student Saint Petersburg State Mining University
Abstract
Screw bunker executive body is designed to work on the peat deposits and can be used for the extraction of peat deposits from the drilling-out. The paper describes the design of screw bunker executive authority and proposed calculation of energy consumption for cutting.
Область исследования:
(Archived) Mining electromechanics and mining equipment
References
- Batalov A.P. Calculation of loadings on walls of bunkers cylinder forms // Proceeding of mining Institute. Saint Petersburg, 2008. Т.178. P.31-34.
- Drilling tool for machine tool rotary buregiya // V.A.Peretolchin, N.N.Strabykin, Ya.N.Dolgun, Y.M.Koledin, E.V.Chudogashev, I.K.Vladimirtsev, J.P.Shemetov. Irkutsk, 1975. 204 p.
- Mihajlov A.V., Kremcheev E.A., Bolshunov A.V., Nagornov D.O. Perspektivy of development of new technologies of extraction of peat // Mining informational and analytical bulletin (scientific and technical journal). 2010. N 9. P. 191-192.
- Peretolchin V.A. The rotary drilling in quarries. Moscow, 1975. 128 p.
- Tikhonov N.V. Mining engineer. Moscow, 1960. 335 p.
- Filimonov N.A. Excavation and tunneling mining machines. Moscow, 1958. 428 p.
Similar articles
New for criterial equations Nusselt number forced convection in pipes
2012 V. V. Pshenin, A. A. Korshak
Control of gasevolutioncoal-beds – the key factor of creation of safe working conditions
2012 I. V. Kurta
The distribution of late quaternary glacial-marine deposite on the norternmost part оf Novaya Zemlya shelf
2012 D. E. Dorechkina, P. V. Rekant, D. A. Korshunov, A. D. Portnov
Conceptual aspects of declining extraction oilfields valuation methodology under conditions of stable development of national economy
2012 Yu. P. Grigorev, D. D. Chaikovskaya