Determination of the rate of bunker filling screw executive authority and power to cut costs

Authors:
E. D. Kremcheev1
A. V. Bolshunov2
D. O. Nagornov3
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
  • 3 — Saint Petersburg State Mining University
Date submitted:
2011-07-07
Date accepted:
2011-09-24
Date published:
2012-01-01

Abstract

Screw bunker executive body is designed to work on the peat deposits and can be used for  the extraction of peat deposits from the drilling-out. The paper describes the design of screw bunker executive authority and proposed calculation of energy consumption for cutting.

Go to volume 195

References

  1. Баталов А.П. Расчет нагрузок на стены бункеров цилиндроконической формы / А.П.Баталов, Э.А.Кремчеев // Записки Горного института. СПб, 2008. Т.178. С.31-34.
  2. Буровой инструмент для станков вращательного бурегия / В.А.Перетолчин, Н.Н.Страбыкин, Я.Н.Долгун, Ю.М.Коледин, Е.В.Чудогашев, И.К.Владимирцев, Ю.П.Шеметов. Иркутск, 1975. 204 с.
  3. Михайлов А.В. Перспективы развития новых технологий добычи торфа / А.В.Михайлов, Э.А Кремчеев., А.В.Большунов, Д.О.Нагорнов // Горный информационно-аналитический бюллетень. 2010. № 9. С.191-192.
  4. Перетолчин В.А. Вращательное бурение скважин на карьерах. М., 1975. 128 с.
  5. Тихонов Н.В. Горная механика. М., 1960. 335 с.
  6. Филимонов Н.А. Выемочные и проходческие горные машины. М., 1958. 428 с.

Similar articles

Analisys of surface water condition of the murmansk district which is exposed to a negative impact оf the mining-enrich industry
2012 V. A. Petrova, V. A. Rogalev
Rationale for choice of technological schemes of producing aggregates by open-cast mine with mobile crushing and grading complex
2012 V. V. Ivanov, A. A. Faul, A. N. Kuznetsov
Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions
2012 R. E. Dashko, E. N. Kovaleva
The designing of the constructions of the pillar underground station with applying of the low-settle building technology
2012 A. G. Protosenya, P. A. Demenkov, M. A. Karasev, N. A. Belyakov, K. P. Bezrodnyi, V. A. Maslak
Tax system in the oil industry Russia
2012 V A. Osovskii
Synthesis of the mechanism of the effektor of a gathering-arm loader
2012 M. A. Vasileva, A. Yu. Kuzkin, I. P. Timofeev