About of an estimation of durability of the gas pipeline which is in a ground, at conducting explosive works
About authors
- 1 — post-graduate student Saint Petersburg State Mining University
- 2 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
Abstract
In this paper we propose a method for assessing the impact of blasting operations in the pipeline, which is based on mathematical modeling of the joint fluctuations of pipeline and soil during the passage of seismic waves from blasting. The calculation was performed in a plane problem, the soil was modeled Winkler elastic foundation, piping – a geometrically nonlinear shell. The numerical implementation was carried out using an iterative algorithm.
Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
The base of the elastic
ground
shock wave
the pipeline
the calculation of strength
the impact of an explosive
numerical calculation
Funding:
None
References
- Belov N.N., Kopanitsa D.G., Kumpyak O.G. YugovN.T. Calculation of reinforced concrete structures to blast and impact loads.Tomsk, 2004.
- Gorokhov N. L. Calculation of curved structural elements on the Winkler foundation // Development of mineral resources in the North. Challenges and Solutions: Proceedings of the 8th Inter-Regional. Scientific-Practical Conf. Vorkuta, 2010.
- Gorokhov N.L. An approach to the calculation of curved structural elements on the elastic base // Development of mineral resources in the North. Challenges and Solutions: Proceedings of the 8th Inter-Regional. Scientific-Practical Conf. Vorkuta, 2010.
- Unified safety rules for blasting. PB 13-407-01. Moscow, 2002.
- Klepikov S.N. Calculation of structures on elastic foundation. Kiev, 1957.
- Lyakhov G.M., Pokrovskii G.I. Blast waves in soils. Moscow, 1962.
Similar articles
Analysis of the effectiveness of regulations in the subsoil usage (illustrated on regulating the level of cost oil under psas)
2012 N. E. Chebaeva
Rationale for choice of technological schemes of producing aggregates by open-cast mine with mobile crushing and grading complex
2012 V. V. Ivanov, A. A. Faul, A. N. Kuznetsov
Optimization of pulse width modulation for multilevel converters of variable-frequency electric drive
2012 A. V. Kudryavtseva, O. B. Shonin
Automatic compensation of influence of stirring factors on measurement of coal bulk weight from the clearing face
2012 R. M. Proskuryakov, I. N. Voityuk, A. V. Kopteva