Developing loading facilities with gathering-arm active action
About authors
- 1 — senior lecturer Saint Petersburg State Mining University
- 2 — post-graduate student Saint Petersburg State Mining University
- 3 — post-graduate student Saint Petersburg State Mining University
- 4 — post-graduate student Saint Petersburg State Mining University
Abstract
Is resulted in the article review basic designs loading parts of mining machines, analysis of physical processes of occurring at loading of rock massive is leaded with gathering-arm, basic directions of perfection of cutting heads with coupled gathering-arm are considered, and also is offered it is basic new variant of constructive execution of executive body of нагребать part for creation gathering-arm of conation.
Область исследования:
(Archived) Mining electromechanics and mining equipment
Funding:
None
References
- Krysachenko E.A. Research of interaction process between the operating device of the loading machine with pair heaping up legs and a pile of the lumpy bulk material: candidate of technical sciences. Novocherkassk, 1971. 22 p.
- Khazanovich E.Sh., Lenchenko V.V. Blast-hole drilling drifting system. Novocherkassk, 2000. 504 p.
Similar articles
Division into districts of municipal union by complex of an accomplishment objects
2012 V. A. Kiselev, O. A. Tributs
The developing of the system of actions for realization of transition from land shares to land plots
2012 A. S. Garbatsevich
Working out of technology of reception of fuel briquettes from few consumed carbon raw materials
2012 E. V. Skripchenko, V. Yu. Kalashnikova, V. B. Kuskov
Substantiation of the variant of the best and most the effective use of the ground area оf the Vasileostrovsky region of the city of Saint Petersburg
2012 E. N. Bykova, Yu. S. Morozova