Developing loading facilities with gathering-arm active action
About authors
- 1 — senior lecturer Saint Petersburg State Mining University
- 2 — post-graduate student Saint Petersburg State Mining University
- 3 — post-graduate student Saint Petersburg State Mining University
- 4 — post-graduate student Saint Petersburg State Mining University
Abstract
Is resulted in the article review basic designs loading parts of mining machines, analysis of physical processes of occurring at loading of rock massive is leaded with gathering-arm, basic directions of perfection of cutting heads with coupled gathering-arm are considered, and also is offered it is basic new variant of constructive execution of executive body of нагребать part for creation gathering-arm of conation.
Область исследования:
(Archived) Mining electromechanics and mining equipment
Funding:
None
References
- Krysachenko E.A. Research of interaction process between the operating device of the loading machine with pair heaping up legs and a pile of the lumpy bulk material: candidate of technical sciences. Novocherkassk, 1971. 22 p.
- Khazanovich E.Sh., Lenchenko V.V. Blast-hole drilling drifting system. Novocherkassk, 2000. 504 p.
Similar articles
Method of measurement of anisotropic electron velocity distribution function
2012 A. S. Mustafaev, A. Y. Grabovskiy
Estimation of influence of territorial conditions on market cost of the ground areas in the gardening noncommercial organisations of Leningrad region
2012 P. M. Snytko
Identification of turn to turn faults in power transformers by means of the amplitude-phase analysis of negative sequence currents
2012 D. I. Ivanchenko, O. B. Shonin