Submit an Article
Become a reviewer
Vol 196
Pages:
266-270
Download volume:
RUS
Article

Developing loading facilities with gathering-arm active action

Authors:
G. V. Sokolova1
M. A. Vasileva2
M. Yu. Nepran3
S. A. Lavrenko4
About authors
  • 1 — senior lecturer Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — post-graduate student Saint Petersburg State Mining University
  • 4 — post-graduate student Saint Petersburg State Mining University
Date submitted:
2011-08-13
Date accepted:
2011-10-29
Date published:
2012-05-22

Abstract

Is resulted in the article review basic designs loading parts of mining machines, analysis of physical processes of occurring at loading of rock massive is leaded with gathering-arm, basic directions of perfection of cutting heads with coupled gathering-arm are considered, and also is offered it is basic new variant of constructive execution of executive body of нагребать part for creation gathering-arm of conation.

Область исследования:
(Archived) Mining electromechanics and mining equipment
Keywords:
Loader gathering-arm firing pin rock massive freight traffic productivity
Go to volume 196

References

  1. Krysachenko E.A. Research of interaction process between the operating device of the loading machine with pair heaping up legs and a pile of the lumpy bulk material: candidate of technical sciences. Novocherkassk, 1971. 22 p.
  2. Khazanovich E.Sh., Lenchenko V.V. Blast-hole drilling drifting system. Novocherkassk, 2000. 504 p.

Similar articles

Evaluation of phase relationships harmonics frequency drives
2012 Ya. E. Shklyarskii, V. S. Dobush
Industrial gold mineralization in the structures of the mineralized zones on the example оf the Natalka deposit in Magadan region
2012 K. E. Chernyshev
Synergetic effect of surface-modified powders of aluminium and its manifestation in tribology
2012 A. G. Syrkov, T. G. Kamalova, E. V. Remzova
Estimation of the is intense-deformed condition of massif at building inclined tunnel of metro station «Admiralty» of the Saint Petersburg underground
2012 S. Yu. Novozhenin
Specification of parameters of the investment valuation of the project on the method оf real options
2012 S. V. Lysak
Kholodninskoe deposit: development strategy, main engineering solutions, perspective exploration
2012 Vladimir S. Litvinenko, V. P. Zubov, O. V. Mikhailenko