Submit an Article
Become a reviewer
Vol 197
Pages:
180-183
Download volume:
RUS
Article

Engineering-geological and geoecological principals of development activities for geological environment protection at underground construction

Authors:
I. P. Ivanov
About authors
  • Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
Date submitted:
2011-09-28
Date accepted:
2011-11-19
Date published:
2012-05-25

Abstract

The engineering-geological and geo-ecological problems in the construction of underground structures are considered in the present paper. The different nature of the technical measures to reduce the environmental load are considered. This paper focuses on the various engineering-geological factors affecting the security of the geological environment. It is indicated the influence of hydrogeological conditions during mining operations both open pit and underground. It is noted change in the landscape associated with the formation of man-made depressions in the earth's surface a result of preliminary drainage area of future construction. The problems associated with waste storage of mining and processing industries are considered. A result of research presents a conceptual approach for the using of engineering-geological information to solve environmental problems.

Область исследования:
(Archived) Present-day problems of geomechanics, mining practice and innovation technologies in mining engineering
Keywords:
engineering geology environmental protection violation of the landscape underground construction
Go to volume 197

References

  1. Galperin A.M. Geomechanics of open pit mining. Moscow, 2003.
  2. Zaikanov V. G., Minakov T.B. Geoecological assessment of territories. Moscow, 2005.
  3. Ivanov I.P. Engineering-geological researches in mining. Leningrad, 1987.
  4. Mironenko V.A., Molskiy E.V., Rumynin V.G. Research of underground waters pollution in mining areas. Leningrad, 1988.
  5. Fisenko G.L. Limiting state of rocks round mine working. Moscow, 1976.

Similar articles

Improving of the competitiveness of iron ore production based on full using of mineral raw materials
2012 A. S. Klyamko, V. L. Trushko, V. B. Kuskov
Superdeep desiliconization aluminate solution based on calcium hydrocarboaluminates
2012 V. M. Sizyakov, E. S. Kononenko, E. V. Sizyakova
Modern instruments of quantitative risk analysis and risk assessment of innovation projects
2012 N. G. Privalov, A. N. Kozlovskii, V. N. Petrov
Acceptable risk assessment of production in mining industry
2012 A. N. Shabarov, G. I. Korshunov, E. G. Buldakova, Z. N. Cherkai
Influence of geological factors on the composition of foam agent for geological prospecting drilling
2012 Yu. D. Muraev
Main problems of new generation open pit mines design
2012 S. P. Reshetnyak