Submit an Article
Become a reviewer
Vol 199
Pages:
236
Download volume:
RUS

Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition

Authors:
V. N. Gusev1
A. S. Mironov2
V. L. Trushko3
Nguen Suan Bak4
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
  • 4 — National Mineral Resources University (Mining University)
Date submitted:
2011-11-04
Date accepted:
2012-01-10
Date published:
2012-12-29

Abstract

The way of precalculation downing and raisings of the wires suspended to support air Line of electric transfers, being in a zone of influence of mountain works is resulted. The technique of carrying out of monitoring high-voltage air Line of electric transfers is stated at it mines works.

Go to volume 199

References

  1. Правила охраны сооружений и природных объектов от вредного влияния подземных горных разработок на угольных месторождениях / ВНИМИ. СПб, 1998. 291 с.
  2. Патент 2294289 РФ. Способ определения удлинения проводов на участках между опорами высоковольтных линий электрических передач (ЛЭП) / В.Н.Гусев, Б.Н.Абрамович, Е.М.Волохов, А.Н.Евсеев. Опубл. 27.02.2007. Бюл. № 6.

Similar articles

Stress and strain state of «soil – pile foundations» for varios stages of high-rise building construction
2012 D. A. Potemkin, P. A. Demenkov, V. N. Ochnev, A. D. Kuranov
The way of pipeline construction in areas of high seismic activity
2012 A. K. Nikolaev, V. P. Dokukin, O. F. Putikov
Analysis of load formation on lining of tunnel constructed in soil with nonlinear behavior
2012 A. G. Protosenya, V. I. Semenov, I. K. Suprun
Study of the influence of the form of security structures erected lava following on the mechanism underlying it rocks displacement
2012 V. N. Mokrienko, S. G. Negrei, D. N. Kurdyumov
Estimation of condition tubbing lining escalator tunnel of metro station «Admiralty» by results of lazerno-scanning survey
2012 V. K. Nosov
Valuation of sustainable of pit wall based on data of digital photography of outcrop surfaces
2012 M. G. Mustafin, A. P. Sannikova