Look-ahead estimation of consequences mines works under high-voltage line of electric transfers and monitoring behind their condition

Authors:
V. N. Gusev1
A. S. Mironov2
V. L. Trushko3
Nguen Suan Bak4
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
  • 4 — National Mineral Resources University (Mining University)
Date submitted:
2011-11-04
Date accepted:
2012-01-10
Date published:
2012-05-01

Abstract

The way of precalculation downing and raisings of the wires suspended to support air Line of electric transfers, being in a zone of influence of mountain works is resulted. The technique of carrying out of monitoring high-voltage air Line of electric transfers is stated at it mines works.

Go to volume 199

References

  1. Правила охраны сооружений и природных объектов от вредного влияния подземных горных разработок на угольных месторождениях / ВНИМИ. СПб, 1998. 291 с.
  2. Патент 2294289 РФ. Способ определения удлинения проводов на участках между опорами высоковольтных линий электрических передач (ЛЭП) / В.Н.Гусев, Б.Н.Абрамович, Е.М.Волохов, А.Н.Евсеев. Опубл. 27.02.2007. Бюл. № 6.

Similar articles

Estimation of condition tubbing lining escalator tunnel of metro station «Admiralty» by results of lazerno-scanning survey
2012 V. K. Nosov
Allocation of areas under the coal-mining industry
2012 E. N. Bykova
About the necessity of accounting of geodinamically active fractures zones in cadastral valuation оf settlement earths
2012 V. A. Kiselev, O. A. Tributs
Complex method of assesing mechanical condition of rocks in vicinity storehouses of radioactive waste
2012 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov
Modeling of stress-strain state of ore massive Yakovlevsky caused by mining works under the protection ceiling
2012 O. V. Trushko, A. V. Streletskii
Use of hydrogeomechanical monitoring during shielding tunnel for underground station оf Saint Petersburg subway «Admiralteiskaya»