Submit an Article
Become a reviewer
Vol 199
Pages:
173-175
Download volume:
RUS
Article

Analysis of load formation on lining of tunnel constructed in soil with nonlinear behavior

Authors:
A. G. Protosenya1
V. I. Semenov2
I. K. Suprun3
About authors
  • 1 — Ph.D., Dr.Sci. professor National Mineral Resources University (Mining University)
  • 2 — post-graduate student National Mineral Resources University (Mining University)
  • 3 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2011-11-18
Date accepted:
2012-01-03
Date published:
2012-12-29

Abstract

Method of excavation support and tunnel lining design is worked out. Stiffness of soil strata is considered as nonlinear elastic. The problem is solved in plane strain condition according to elastic theory. The distribution of average load on excavation support is given.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
nonlinear elastic soil load tunnel construction method
Go to volume 199

References

  1. Baklashov I.V., Kartozia B.A. Mechanics of under-ground structures and support design. Moscow, 1984.
  2. Bulichev N.S. Mechanics of underground structures. Moscow, 1982.
  3. Dashko R.E. Rock mechanics: Book. Moscow,1987.
  4. Protesena A.G., Ogorodnikov J.N., Demenkov P.A etc. Mechanics of underground structures.3d numerical modeling and monitoring. Saint Petersburg, 2011.
  5. Stavrogin A.N., Protosena A.G. Deformation andfailure of rocks. Moscow, 1992.

Similar articles

Development of the composition and technology for industrial production of an emulsifier used in oil рroduction for inverse water-in-oil emulsions
2012 N. K. Kondrasheva, M. K. Rogachev
Land measuring at substracture construction of Mariinsky theatre second stage in Saint Petersburg
2012 D. A. Afonin, E. S. Bogomolova, M. Ya. Bryn, D. V. Krashenitsin, O. P. Sergeev, E. G. Tolstov
Determination of the stress parameters of nearbord areas of open pits, located in highly stressed rock massif
2012 A. D. Kuranov
Multifunctional underground facility comprises a subway transferring node
2012 P. A. Demenkov
Features of pumping of the liquefied hydrocarbonic gases on pipelines
2012 E. I. Krapivskii, O. F. Putikov, V. M. Pisarevskii
Building of construction pit and investigation of displacement wall of the secant pile
2012 S. V. Stepanenko