Prediction of high speed railway tunnel induced settlement on the Sants – La Sagrera area (Barcelona)

Authors:
M. A. Karasev
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2011-11-07
Date accepted:
2012-01-11
Date published:
2012-12-29

Abstract

Finite element analysis of tunnel construction in urban area is given. Soil material model parameters determination is considered. 3d finite element analysis of tunnel development is carried out. Variation of settlements and settlement troughs according to face and radial shield pressure and initial stress state are shown. Comparison of numerical modeling results and results of in-situ settlements measurement is done.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
numerical modeling tunnel surface settlement urban area underground structures
Funding:

None

Go to volume 199

References

  1. Karasev M.A. Tunnel construction in the urban areaand lining stress state // Development of North resources and the solution of the proplems. 9-th international scientific conference. Vorkuta, 2011.
  2. Karasev M.A. Numerical modeling of railroad tunnel TBM construction in the urban area // Proceeding of Tula State University. Earth Science. Tula, 2011.
  3. O’Reilly M.P, New B. Settlement above tunnels inthe United Kingdom- their magnitude and prediction. In: Proc. Int. Symposium Tunnelling ‘82, London, 7-11 June. London: Institution of Mining and Metallurgy, 1982.
  4. Experts report No 2. High Speed Railway AVETunnel, Section Sants-Sagrera. Evolution of TBM Advance and Measures for Increase of Safety Margins in Vicinity of World Heritage Property «Works of Gaudi». Barcelona, 2010.
  5. Peck R.B. Deep excavations and tunnelling in softground. In: Proc. 7th ICSMFE, State-of-the-art Volume, Mexico City. Mexico: Sociedad Mexicana de Mecánica de Suelos, 1969.

Similar articles

Application of radar scanning system GPRI-2 for monitoring the eath’s surface displacement
2012 M. G. Mustafin, A. K. Omarova, D. V. Mozer
Geomechanical justification of design parameters of room-and-pillar mining system for designing оf deep-lying horizons of SYBR
2012 D. V. Sidorov
Substantiating of plasma-pulse technology use to increase oil recovery on high-viscosity oil fields
2012 A. A. Molchanov, I. E. Dolgii, A. V. Kozlov
Formation and development of mining-and-geological processes in relation to changes in engineering-geological and hydrogeological conditions on Yakovlevsky mine
2012 R. E. Dashko, E. N. Feller
About the necessity of accounting of geodinamically active fractures zones in cadastral valuation оf settlement earths
2012 V. A. Kiselev, O. A. Tributs
Numerical modeling of deep excavation structures behavior during construction
2012 A. G. Protosenya, D. A. Potemkin, S. V. Stepanenko