Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
Authors:
About authors
- Ph.D. associate professor National Mineral Resources University (Mining University)
Abstract
Examined the scientific and methodological provisions for the safe application of room-and-pillar system in complex geotechnical and geodynamic conditions due to advance the well processing zones bump hazard, the identification of which is achieved on the basis of long-term forecasting of the state of stress and bump hazard using automated software system «PRESS 3D URAL».
Область исследования:
(Archived) Mining geomechanics
Funding:
None
References
- Instructions for safe mining operations on ores and nonmetallic deposits of underground construction sites prone and dangerous impacts on the mountain. RD 06-329-99 / SE STCSafety GGTN industry in Russia. Moscow, 2000.
- Guidelines for the use of software for the calculationand graphical construction of the stresses in the rock massaround openings / VNIMI. Leningrad, 1981.
Similar articles
Influence condition of ground on complexity in the process open pit Kuzbas`s coal deposits
2013 R. A. Takranov, A. A. Litvinova
Problems of small and medium Russian towns residential development cadastral valuation
2013 O. Y. Lepikhina, V. G. Gorelikov
System of ecological monitoring of atmospheric air of mining industrial aglomeration
2013 M. A. Pashkevich, Y. D. Smirnov, T. A. Petrova
Influence of changes in constructive elements of protective constructions on behavior of the soil massif near deep ditches
2013 D. A. Potyomkin