Article

Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions

Authors:
D. V. Sidorov
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2012-11-03
Date accepted:
2013-01-01
Date published:
2013-11-18

Abstract

Examined the scientific and methodological provisions for the safe application of room-and-pillar system in complex geotechnical and geodynamic conditions due to advance the well processing zones bump hazard, the identification of which is achieved on the basis of long-term forecasting of the state of stress and bump hazard using automated software system «PRESS 3D URAL».

Область исследования:
(Archived) Mining geomechanics
Keywords:
methods geomechanical software room-and-pillar system pillar bump hazard ore deposit
Go to volume 204

References

  1. Instructions for safe mining operations on ores and nonmetallic deposits of underground construction sites prone and dangerous impacts on the mountain. RD 06-329-99 / SE STCSafety GGTN industry in Russia. Moscow, 2000.
  2. Guidelines for the use of software for the calculationand graphical construction of the stresses in the rock massaround openings / VNIMI. Leningrad, 1981.

Similar articles

Automation of architecture and urban-planning authority as the basis of strategic planning
2013 P. P. Spirin, E. B. Bejaeva, V. F. Kovyazin, E. D. Asetskaya
Determining of the parameters of water conducting fracture zone through values of underminen strata horizontal deformations values
2013 V. N. Gusev, D. A. Ilukhin, A. G. Aleksenko
Limitations management of land resources is based on information support for state real estate cadastre
2013 V. A. Kiselev, A. G. Shabaev
Influence of changes in constructive elements of protective constructions on behavior of the soil massif near deep ditches
2013 D. A. Potyomkin
Metrological control administered surveying work
2013 V. A. Golovanov
Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
2013 V. G. Potjuchliaev, G. I. Khudiakov