Modeling of work of elements of the combined box-shaped and pile base in weak soil
About authors
- 1 — National Mineral Resources University (Mining University)
- 2 — National Mineral Resources University (Mining University)
Abstract
In work results of modeling of work of two options of the multipurpose underground complex being the base of the multystoried high-rise building are considered. The complex plays a role of the combined foundation. Modeling is executed taking into account stage-by-stage construction of underground and land part of the building.
Similar articles
Analysis of the effect of assembly errors on deviations from design arch sizes
2013 V. A. Kougiya, O. P. Sergeev
Rationale for the accuracy and parameters of cadastral surveying of land urbanized territories
2013 M. Ya. Bryn, P. A. Veselkin, V. N. Ivanov, A. V. Astapovich, Yu. V. Shcherbak
Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
2013 D. V. Sidorov
Ultrasonic study of creep in polycrystalline rocks
2013 V. M. Tsaplev, R. M. Ivanyuk, V. V. Zverevich