Prediction of surface settlements duo to construction of underground structures in geological condition of Saint Petersburg

Authors:
M. A. Karasev
About authors
  • Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2012-11-16
Date accepted:
2013-01-18
Date published:
2013-11-18

Abstract

In work the option of the multipurpose underground complex being part of the multystoried high-rise building is considered. The complex settles down in underground part of the building and carries out a base role, replacing with itself the usual plates-but-pile base. Predesigns by a method of final elements taking into account staging of construction of an underground complex and the land high-rise building are executed. Sizes and a picture of distribution of vertical displacements are received as a result of calculations.

Область исследования:
##submission.archive.categories## Mining geomechanics
Keywords:
subway station underground structures geomechanical model numerical modelling surface settlement deformation
Go to volume 204

References

  1. Graham J., Houlsby G.T. Anisotropic elasticity of a natural clay // Geotechnique. 1983. Vol.33(2). P.165-180.
  2. Hardin B.O., Drnevich V.P. Shear modulus and damping in soils: Design equations and curves // Proc. ASCE: Journal of Soil Mechanics and Foundations Division. 1972. N 98. P.667-692.
  3. Peck R.B. Deep excavations and tunnelling in soft ground // Proc. 7th ICSMFE. Mexico City, 1969. P.225-290.

Similar articles

Theoretical basis of geomaterial accounted for induced and inherent anisotropy
2013 M. A. Karasev, D. A. Potyomkin
System of ecological monitoring of atmospheric air of mining industrial aglomeration
2013 M. A. Pashkevich, Y. D. Smirnov, T. A. Petrova
The criteria for land cover classification systems of Saint Petersburg protected areas
2013 A. A. Bogolyubova
Application of automated software system «PRESS 3D URAL» for predicting bump hazard zones parameters and discharge borehole well in advance of the ore deposit and pillars in difficult geomechanical conditions
2013 D. V. Sidorov
Recommendations on the content and periodicity of geodetic control of the crane tracks electric bridge crane
2013 V. G. Potjuchliaev, G. I. Khudiakov
Optional distances between cylinder reflectors and laser scanning system
2013 M. G. Vystrchil