Submit an Article
Become a reviewer
Vol 206
Pages:
199
Download volume:

The assessment of the strategic project on increase of capacity of Yakovlevsky mine JSC «Metall-Group»

Authors:
T. V. Ponomarenko1
O. I. Tsarakov2
I. A. Akinina3
T. A. Pikalova4
About authors
  • 1 — National Mineral Resources University (Mining University)
  • 2 — National Mineral Resources University (Mining University)
  • 3 — National Mineral Resources University (Mining University)
  • 4 — National Mineral Resources University (Mining University)
Date submitted:
2013-01-28
Date accepted:
2013-03-09
Date published:
2013-07-01

Abstract

The characteristic of the unique iron ore enterprise is given. The assessment of capital expenses for building of land and underground objects of Yakovlevsky mine is made. The assessment of the current expenses for realization of the project is made. The economic indicators of efficiency of the project on increase of capacity of Yakovlevsky mine JSC «Metall-group» to 4,5 million tons per year are calculated. Planned technical and economic indicators are given. The assessment of financing source of the project is made.

Go to volume 206

References

  1. Анализ динамики мировых и российских цен на мелкодробленую руду с содержанием железа 63 %. Прогноз до 2018 г. // Аналитический обзор. ОАО «Институт исследования товародвижения и конъюнктуры оптового рынка». М., 2010.
  2. Баранов А.О. Расчет параметров технологических процессов подземной добычи руд. М., 1985.
  3. Коссов В.В. Методические рекомендации по оценке эффективности инвестиционных проектов / В.В.Коссов, В.Н.Лившиц, А.Г.Шахназаров. М., 2000.
  4. Нормы технологического проектирования горнодобывающих предприятий черной металлургии с подземным способом разработки. Л., 1970.
  5. Пономаренко Т.В. Ключевые показатели эффективности сбалансированной системы показателей в стратегическом управлении горными компаниями / Т.В.Пономаренко, И.А.Акинина // Записки Горного института. Т.201. 2012.

Similar articles

Disposal of dehydrated sediments of water objects of the mining regions
2013 V. A. Petrova, M. A. Pashkevich
Mineralogical and geochemical characteristic of zwitters from Severny massif (Chukotka)
2013 A. V. Kurguzova, V. I. Alekseev
Application of numerical modeling for design of safety paramters of safety mining method in highly stressed masses
2013 A. D. Kuranov
Rock displacements in the vicinity of the face of the unsupported excavation
2013 E. R. Kovalevskii, S. P. Mozer, M. A. Karasev, N. I. Kosukhin
Substantiation of the approach for establishment of the initial payment size for the use of natural resources
2013 E. A. Golovina
Engineering-geological substantiation of safety building and operation constructions of different function within the lowland Predglintovaya (the Western part of the Leningrad region)
2013 R. E. Dashko, A. A. Korobko