Submit an Article
Become a reviewer
Vol 206
Pages:
139-142
Download volume:
RUS
Article

Pre-concentration of raw materials using sensor-based sorting

Authors:
A. V. Fadina1
E. E. Andreev2
V. V. Lvov3
About authors
  • 1 — student National Mineral Resources University (Mining University)
  • 2 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 3 — Ph.D. associate professor National Mineral Resources University (Mining University)
Date submitted:
2013-01-10
Date accepted:
2013-03-02
Date published:
2013-12-27

Abstract

It is widely known that the processes of ore concentration have large part of operating costs for ore processing at the concentration plant. Often processes of crushing and grinding of raw materials account more than 70 % of the total spending. The aim of the optimal mineral processing is to decrease these costs, one solution of this problem is to preconcentrate raw material, which allows to withdraw from the further processing more than 80 % of the material, which doesn't contain valuable component, or has its dumping grade.

Область исследования:
(Archived) Metallurgy, physical and chemical regularities of technological processes
Keywords:
pre-concentration sensor-based sorting operating costs sensor-based separator
Funding:

None

Go to volume 206

References

  1. Efremortsev N.S. New technology of underground mining. Moscow, 2009.
  2. Litvintsev E.G., Cobzev А.S. Prospects for expansion of gold mineral resources based on pre-concentration. Moscow, 2008.
  3. Mocrousov V.А., Lileev V.А. Radiometric concentration of non-radioactive ores. Moscow, 1970.
  4. Optoelectronic sorting // Official newsletter of the IMS Group of Companies. 2003. N 6.
  5. Sivamohan R., Forssberg E., Electronic sorting and other pre-concentration methods // Minerals Engineering. 1991. Vol.4. N 7-11.
  6. Wyman R.A. Sorting by electronic selection // SME- Handbook on Mineral Processing. 1985. Vol.7. N 5.

Similar articles

The assessment of the strategic project on increase of capacity of Yakovlevsky mine JSC «Metall-group»
2013 T. V. Ponomarenko, O. I. Tsarakov, I. A. Akinina, T. A. Pikalova
Cylindrical probe in anisotropic plasma: how can we achieve reliable results?
2013 A. S. Mustafaev, A. Y. Grabovskiy
Choice and substantiation of dragline’s entry way at untransport working of overbaden bench in the Afanasevsky deposit
2013 M. A. Marinin, D. A. Vedrova
Development wells in complicated conditions
2013 K. S. Kupavykh
Conditions and peculiarities of scale formation in the later stages of oil reservoir development
2013 L. A. Shangaraeva, A. V. Petukhov
The corporate social responsibility of system forming mining and metallurgical companies of Russia
2013 T. A. Pikalova