Measurement of the seismic blast wave during the construction of the pipeline trench near the existing pipeline

Authors:
R. A. Vosgrin1
L. V. Surovitsky2
About authors
  • 1 — student National Mineral Resources University (Mining University)
  • 2 — chief engineer «PetroGazService» LLC
Date submitted:
2013-01-06
Date accepted:
2013-03-19
Date published:
2013-12-27

Abstract

In this article describes how to calculate the safety charge mass during mass explosion at a pipeline trench construction which parallel to the existing underground pipeline. A method of calculating the maximum allowable velocity seismic blast wave in the mass explosions, for monitor the production of blasting. Presented the dependences of speed seismic blast waves on the parameters of drilling and blasting.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
seismic safety blasting blasting parameters the seismic waves velocity
Go to volume 206

References

  1. Artyomov V.А. Research seismic safety conditions of production drilling and blasting operations near the existing pipeline // V.A. Artyomov, Yu.I. Vinogradov, S.V. Gustov // Explosion science. N 103/60. 2010.
  2. Medvedev S.V. Engineering seismology. Мoscow, 1962.
  3. Medvedev S.V. Seismic mining explosions. Мoscow, 1964.
  4. Recommendation P 442-81 on the production technology of blasting in frozen soil and rock in the construction of pipelines parallel to existing underground steel pipelines. VNIIST. Moscow, 1982.
  5. Sadovskiy M.A. Experimental research of the mechanical action of the explosion shock wave. Proceedings of Seismological Institute of the USSR Academy of Sciences. Moscow-Leningrad, 1945. N 116.

Similar articles

Disposal of dehydrated sediments of water objects of the mining regions
2013 V. A. Petrova, M. A. Pashkevich
Structure-texture specialties gold-palladium ores of deposit Chudnoye (Polar Urals)
2013 D. P. Kosianov
Problems of engineering geology of Primorskiy district of Saint Petersburg associated with the prospects of its underground space development
2013 R. E. Dashko, Y. A. Karpova
Cylindrical probe in anisotropic plasma: how can we achieve reliable results?
2013 A. S. Mustafaev, A. Y. Grabovskiy
Optimization of work of dust supperession sprayer with use of computing modelling
2013 A. V. Ivanov, Y. D. Smirnov
Development wells in complicated conditions
2013 K. S. Kupavykh