Submit an Article
Become a reviewer
Vol 208
Pages:
32-35
Download volume:
RUS
Article

Economic evaluation of reclamation an example Olimpiada GOK

Authors:
O. A. Marinina1
M. A. Marinin2
About authors
  • 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
  • 2 — post-graduate student National Mineral Resources University (Mining University)
Date submitted:
2013-08-28
Date accepted:
2013-10-14
Date published:
2014-07-15

Abstract

Methodical features of calculation of cost-effectiveness evaluation of remediation, the accounting of capital and operating costs at various stages of recovery process of topsoil are considered. The example of calculation the cost of reclamation of Olympiada GOK is given.

Область исследования:
(Archived) Rational subsurface use: theory, methodology, practice
Keywords:
reclamation capital costs operating costs economic efficiency costeffectiveness evaluation
Go to volume 208

References

  1. Slavikovskaya Iu.O. Economic evaluation of technical remediation of man-made subsurface voids // Subsoil. ХХI. 2008. N 1. P.86-89.

Similar articles

Method of identifying models of electronic equipment failure of automation control of dynamic systems
2014 A. A. Klavdiev, O. V. Afanasyeva
Organization of project offices
2014 V. Ia. Pashkin, N. L. Pashkina
The definition of hedge accounting points in international financial reporting standards
2014 T. A. Tarabarinova, D. A. Iakupova
Combinatorial synthesis of flexible flowsheets for ore enrichment
2014 G. I. Ankudinov, I. G. Ankudinov
To bring the normative base of the Russia in compliance with the World Trade Organization requirements
2014 N. M. Lobov
Concept of an integraed economic assessment of natural resources (on the example of national park «Kurshskaya scythe»)
2014 I. Yu. Vasilevich