Economic evaluation of reclamation an example Olimpiada GOK
About authors
- 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
- 2 — post-graduate student National Mineral Resources University (Mining University)
Abstract
Methodical features of calculation of cost-effectiveness evaluation of remediation, the accounting of capital and operating costs at various stages of recovery process of topsoil are considered. The example of calculation the cost of reclamation of Olympiada GOK is given.
Область исследования:
(Archived) Rational subsurface use: theory, methodology, practice
Keywords:
reclamation
capital costs
operating costs
economic efficiency
costeffectiveness evaluation
References
- Slavikovskaya Iu.O. Economic evaluation of technical remediation of man-made subsurface voids // Subsoil. ХХI. 2008. N 1. P.86-89.
Similar articles
Method of identifying models of electronic equipment failure of automation control of dynamic systems
2014 A. A. Klavdiev, O. V. Afanasyeva
The definition of hedge accounting points in international financial reporting standards
2014 T. A. Tarabarinova, D. A. Iakupova
Combinatorial synthesis of flexible flowsheets for ore enrichment
2014 G. I. Ankudinov, I. G. Ankudinov