Economic evaluation of reclamation an example Olimpiada GOK
About authors
- 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
- 2 — post-graduate student National Mineral Resources University (Mining University)
Abstract
Methodical features of calculation of cost-effectiveness evaluation of remediation, the accounting of capital and operating costs at various stages of recovery process of topsoil are considered. The example of calculation the cost of reclamation of Olympiada GOK is given.
Область исследования:
(Archived) Rational subsurface use: theory, methodology, practice
Keywords:
reclamation
capital costs
operating costs
economic efficiency
costeffectiveness evaluation
Funding:
None
References
- Slavikovskaya Iu.O. Economic evaluation of technical remediation of man-made subsurface voids // Subsoil. ХХI. 2008. N 1. P.86-89.
Similar articles
Staged conceptual model analysis of heat mode electronic modules automated control systems metallurgical production
2014 I. V. Ivanova, P. V. Pashkin
Representation and processing of knowledge in information automated systems of intelligent field
2014 E. B. Mazakov
Optimization of work of mining complexes on the basis of calculation of material balance of technological process
2014 E. M. Pronin
Environmental aspect of cost reduction for gold processing enterprises of Krasnoyarsk territory
2014 Zh. V. Mironova, L. N. Kuzina, S. F. Bogdanovskaya, K. A. Shulgina