Economic evaluation of reclamation an example Olimpiada GOK
About authors
- 1 — Ph.D. associate professor National Mineral Resources University (Mining University)
- 2 — post-graduate student National Mineral Resources University (Mining University)
Abstract
Methodical features of calculation of cost-effectiveness evaluation of remediation, the accounting of capital and operating costs at various stages of recovery process of topsoil are considered. The example of calculation the cost of reclamation of Olympiada GOK is given.
Область исследования:
(Archived) Rational subsurface use: theory, methodology, practice
Keywords:
reclamation
capital costs
operating costs
economic efficiency
costeffectiveness evaluation
Funding:
None
References
- Slavikovskaya Iu.O. Economic evaluation of technical remediation of man-made subsurface voids // Subsoil. ХХI. 2008. N 1. P.86-89.
Similar articles
Staged conceptual model analysis of heat mode electronic modules automated control systems metallurgical production
2014 I. V. Ivanova, P. V. Pashkin
Analytical method for determining the parameters transmarginal deformation ore for bump hazard assessment for ore deposits at great depths when using room-and-pillar system
2014 D. V. Sidorov
To bring the normative base of the Russia in compliance with the World Trade Organization requirements
2014 N. M. Lobov
Modelling of resource value of the integrated mining companies taking into account corporate programs of development
2014 T. V. Ponomarenko, I. B. Sergeev