Errors and ways of their elimination at calculation of belt conveyors

Authors:
А. M. Factorovich
Date submitted:
1955-07-02
Date accepted:
1955-09-20
Date published:
1956-01-01

Abstract

One of the widely used at present methods of calculation of belt conveyors consists in a preliminary calculation, the initial position of which is the approximately determined value of power on the drive shaft of the conveyor, and in the final calculation - the method of determining the tension in characteristic points of the contour of the traction body. In this method, the accuracy of the final calculation depends on the accuracy of determining the preliminary calculation of the weight of a linear meter of belt. The practice of calculations shows that in a number of cases the error in preliminary determination of belt weight can reach a significant value, as a result of which the final calculation turns out to be insufficiently accurate.The main errors in the preliminary calculation are as follows: 1) the maximum tension of the belt is determined by a formula that is not valid for all cases encountered in practice; 2) the weight of moving parts of the conveyor is taken tentatively.

Область исследования:
Power Engineering
Go to volume 33

Similar articles

To the statement of laboratory researches of the process of scooping of rock mass
1956 V. D. Zinevich
Ways and prospects of mine transportation development in coal industry
1956 V. I. Gerontiev
Ways of unification and improvement of belt conveyors design
1956 Ya. B. Kalnitsky, V. D. Zinevich
To theoretical researches of loading machines with a bucket working body
1956 Ya. P. Grachev
Feasibility study of wagon capacity selection for coal mines
1956 I. T. Karelin
Automation of control of scraper conveyors
1956 D. M. Belenky