Submit an Article
Become a reviewer
Vol 22
Pages:
207-217
Download volume:
RUS
Article

On the influence of the theodolite centering error at the apex of the connecting triangle on the accuracy of solving the adjoining problem using the Weisbach method

Authors:
V. A. Romanov
Date submitted:
1947-07-02
Date accepted:
1947-09-21
Date published:
1949-01-11

Abstract

The issue raised in this article has repeatedly been the subject of research by both domestic and foreign mine surveyors. We will allow ourselves to indicate those literary sources in which attempts were made to provide a solution to the issue raised. In this article, we will not critically examine the views of each of the named authors and refer those interested in this issue to our dissertation. Our task is to resolve the issue raised in general terms and to briefly report on the reasons that led the aforementioned authors to diametrically opposed points of view on the issue raised.

Keywords:
theodolite mine surveying
Go to volume 22

Similar articles

The structure of tungsten deposits in Kukulbei and its environments
1949 I. M. Ozerov
A simplified method for determining the bulk and specific gravity of relatively dense ores
1949 I. V. Ivanov
On some issues of the theory of mine electric locomotive haulage
1949 A. V. Rysev
Unconformities in the stratification of the earth's crust
1949 M. M. Tetyaev
On the boundaries of the region of stress variation in a hoisting rope
1949 I. P. Neronov
Search criteria and signs for asbestos deposits
1949 P. M. Tatarinov