Submit an Article
Become a reviewer
Vol 243
Pages:
293-298
Download volume:
RUS ENG
Article

Justification of stripping and development of a modular mine site for a combined coal mining method in Kuzbass on the example Baikaimskaya mine site

Authors:
Roman I. Shishkov1
Valerii A. Fedorin2
About authors
  • 1 — Postgraduate Student Institute of Coal SB RAS
  • 2 — Ph.D., Dr.Sci. Researcher Institute of Coal SB RAS
Date submitted:
2020-05-05
Date accepted:
2020-05-24
Date published:
2020-06-30

Abstract

The article considers one actual method for development coal deposits in the Kuzbass by open-underground mining. The scientific and practical advantages of the proposed method due to the use of common infrastructure of coal mine and a modular mine site (subsequently transformed into a mining and technological structure operating according to the mine – longwall scheme) are presented. Currently, a development strategy for Kuzbass until 2035 has been developed. As part of the strategy, a draft program for subsoil use is being formed in the coal industry department. The program should take into account all the positive and negative aspects associated with coal mining in cities and municipal areas and also their prospects. In the Kuznetsk coal basin, 42 mines and 52 opencast mines are mining, of which 12 enterprises use partially unified infrastructure. According to the results of open-underground mining work conducted by the laboratory of the Institute of Coal and Coal Chemistry of the Siberian Branch of the Russian Academy of Sciences (Institute of Coal SB RAS), the list of sites includes favorable mining and geological conditions with incidence angles of up to 18 degrees. As open-pit coal production increases, many sites encounter such a parameter as maximum allowable (boundary) strip ratio. At the stage of preparing the feasibility study for the development of a coal deposit, this coefficient is calculated first of all, since duration of enterprise’s work and its economic component depend on it. In order to increase parameters, it is necessary to carry out transition from open works to underground. As a result, coal mine will not work at a loss, providing production with an economically disadvantageous strip ratio.

Область исследования:
Mining
Keywords:
open-underground mining coal deposits strip ratio modular mine site related infrastructure
10.31897/pmi.2020.3.293
Go to volume 243

Similar articles

Features of permeability anisotropy accounting in the hydrodynamic model
2020 Roman I. Yermekov, Vitaly P. Merkulov, Oksana S. Chernova, Mikhail O. Korovin
Methods for assessing the technical compatibility of heterogeneous elements within a technical system
2020 Sergey A. Vasin, Alexander S. Vasilev, Elena V. Plahotnikova
Revisiting the evolution of deformation zones under platform conditions in the case study of the Kungur Ice Cave (Cis-Urals)
2020 Nataliya V. Lavrova
Multi-terminal dc grid overall control with modular multilevel converters
2020 Miguel Jiménez Carrizosa, Nikola Stankovic, Jean-Claude Vannier, Yaroslav E. Shklyarskiy, Aleksei I. Bardanov
Theoretical analysis of frozen wall dynamics during transition to ice holding stage
2020 Mikhail A. Semin, Aleksandr V. Bogomyagkov, Lev Yu. Levin
Deep structure and geodynamic conditions of granitoid magmatism in the Eastern Russia
2020 Viktor I. Alekseev