Submit an Article
Become a reviewer
Vol 34 Iss. 1
Pages:
80-102
Download volume:
RUS
Article

Theoretical substantiation of design and calculation of cage cam parachutes

Authors:
N. N. Smirnov
Date submitted:
1956-07-07
Date accepted:
1956-09-06
Date published:
1957-03-02

Abstract

The development of reliable safety devices to catch the falling stand at the breakage of the hoisting rope is one of the issues that have not received to date a satisfactory design solution.Development of the design of reliably working parachutes to stop the falling stand is necessary in connection with the transition of mining operations to the development of deep horizons and associated with this increase in the speed of movement of stands.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 34

References

  1. Umansky V. B. Mine hoisting installations, Uglegletehizdat, 1948.
  2. Umansky V. B. To the question of reliability of parachutes for rail conductors. Mining Journal, 1946, No. 11-12.

Similar articles

About actual wear of a rope at two-layer winding on a drum of a vertical hoisting installation
1957 G. V. Verstakov
Felix N. Shklyarsky (1883-1955)
1957 S. A. Alatortsev
Basics of calculation of rope cargo bremsbergs with variable angle of inclination
1957 L. P. Severin
Some results of researches of coal destruction efficiency by water jet
1957 V. I. Gerontev
Magnitude of train composition at transportation by contact electric locomotives along the main pumping excavations of coal mines
1957 A. M. Faktorovich
Mechanics of the jaw crusher
1957 P. A. Zhuravlev