Submit an Article
Become a reviewer
Vol 34 Iss. 1
Pages:
80-102
Download volume:
RUS
Article

Theoretical substantiation of design and calculation of cage cam parachutes

Authors:
N. N. Smirnov
Date submitted:
1956-07-07
Date accepted:
1956-09-06
Date published:
1957-03-02

Abstract

The development of reliable safety devices to catch the falling stand at the breakage of the hoisting rope is one of the issues that have not received to date a satisfactory design solution.Development of the design of reliably working parachutes to stop the falling stand is necessary in connection with the transition of mining operations to the development of deep horizons and associated with this increase in the speed of movement of stands.

Область исследования:
(Archived) Without section
Go to volume 34

References

  1. Umansky V. B. Mine hoisting installations, Uglegletehizdat, 1948.
  2. Umansky V. B. To the question of reliability of parachutes for rail conductors. Mining Journal, 1946, No. 11-12.

Similar articles

Basics of calculation of rope cargo bremsbergs with variable angle of inclination
1957 L. P. Severin
Mechanization of borehole drilling at exploratory excavations
1957 A. F. Vaipolin, Yu. M. Misnik, M. I. Shklyarov
Some remarks on adjustment of braking devices
1957 O. N. Chashnikov
Investigation of the characteristics of pneumatic energy consumers
1957 S. S. Smorodin
Operation mode of the local ventilation fan
1957 S. A. Medvedev
Mechanics of the jaw crusher
1957 P. A. Zhuravlev