Economic efficiency of mechanized methods of rock removal during shaft sinking
Authors:
Abstract
As it is known, rock loading in vertical shafts of mines, occupying 60-80% of the time of tunneling cycle, is the most labor-intensive and difficult to mechanize process. Therefore, the choice of the most rational method of rock loading is of particular importance. The main criterion for this is usually the total productivity of machines for loading, i.e. only the reduction of time for loading and the increase in sinking speed achieved due to this is taken into account. This completely misses the cost of rock loading, which has a significant impact on the cost of shaft construction.
Область исследования:
Mining
References
- Danchich V. V. and Chumak S. A. Analysis of the work of loading machines for shaft sinking. Coll. Studies on Mine Construction. Ugletekhizdat, 1954.
- Guzeyev A. G. Organization of Rock Loading by Pneumatic Loaders. Uglegletehizdat, 1957.