Economic efficiency of mechanized methods of rock removal during shaft sinking

Authors:
N. I. Nikolaev
Date submitted:
1959-07-02
Date accepted:
1959-09-05
Date published:
1959-12-19

Abstract

As it is known, rock loading in vertical shafts of mines, occupying 60-80% of the time of tunneling cycle, is the most labor-intensive and difficult to mechanize process. Therefore, the choice of the most rational method of rock loading is of particular importance. The main criterion for this is usually the total productivity of machines for loading, i.e. only the reduction of time for loading and the increase in sinking speed achieved due to this is taken into account. This completely misses the cost of rock loading, which has a significant impact on the cost of shaft construction.

Область исследования:
Mining
Go to volume 42

References

  1. Danchich V. V. and Chumak S. A. Analysis of the work of loading machines for shaft sinking. Coll. Studies on Mine Construction. Ugletekhizdat, 1954.
  2. Guzeyev A. G. Organization of Rock Loading by Pneumatic Loaders. Uglegletehizdat, 1957.

Similar articles

Operation of longwall faces and their interaction with the roof
1959 A. A. Aleinikov
Study of rod support operation in large cross-section excavations with fractured rocks
1959 A. A. Borisov, A. I. Golomolvin, I. P. Tolstunov
Gas release mode and longwall face length in conditions of single seam development
1959 V. I. Fomichev
Research of cleaning process of washing solutions on vibrating screen and sieve conveyor during drilling of mine shafts
1959 V. V. Smirnyakov
New type of rod lock
1959 G. K. Demetriades, G. N. Yassievich
Influence of rod pre-tensioning on the bearing capacity of the roof of underground workings
1959 G. I. Kravchenko