Submit an Article
Become a reviewer
Vol 42 Iss. 1
Pages:
91-98
Download volume:
RUS
Article

Maintenance of preparatory workings at mines of novovolynsk coal deposit

Authors:
N. A. Chemodanov
Date submitted:
1959-07-04
Date accepted:
1959-09-02
Date published:
1959-12-19

Abstract

Observations of the behavior of the side rocks and fastenings of preparatory workings in the conditions of Novovolynskoe coal deposit were carried out by a permanent group of DonUGI with the participation of the author and with the help of engineering and technical workers of mines and trust Novovolynskugol. In the coal-bearing strata of Novovolynskoe deposit there are four coal seams. Two of them, occurring at a depth of 350-375 meters, are working - Volynsky 1 (n7) with a thickness of 0.1-1.2 meters and Volynsky 2 (n3) with a thickness of 0.1-2.1 meters. Bedding of strata is almost horizontal, dip angle is 4-5°. The presence of a number of tectonic disturbances in the form of discharges with displacement amplitudes ranging from a few centimeters to 20 m was detected. Sandy and sandy-clay deposits are significantly developed in the rocks containing coal seams.

Funding:

None

Go to volume 42

Similar articles

Influence of rod pre-tensioning on the bearing capacity of the roof of underground workings
1959 G. I. Kravchenko
Economic efficiency of mechanized methods of rock removal during shaft sinking
1959 N. I. Nikolaev
Possibilities of flexible shields application in the development of ore deposits
1959 E. Ya. Makhno
On the selection of the optimal position of the shaft for transportation
1959 D. F. Borisov
Research of cleaning process of washing solutions on vibrating screen and sieve conveyor during drilling of mine shafts
1959 V. V. Smirnyakov
Study of roof rock movement depending on the technology of seam excavation
1959 A. A. Aleinikov