Submit an Article
Become a reviewer
Vol 45 Iss. 3
Pages:
45-49
Download volume:
RUS

Photograph of a working day at revealing the reserves of labor productivity growth

Authors:
P. A. Kondrashov
Date submitted:
1963-09-21
Date accepted:
1963-11-22
Date published:
1964-10-03

Abstract

For a more complete identification of reserves of labor productivity growth, the photograph of the working day is of great importance. However, the method used in the mining industry to analyze the results of workday photography and design a normal balance is reduced to identifying only direct (apparent) losses of working time. Time losses associated with unproductive use of equipment, incomplete use of the main and auxiliary time, remain undiscovered.

Область исследования:
Economic Geology
Funding:

None

Go to volume 45

Similar articles

Theoretical basis for determining the criterion of economic evaluation of mineral deposits
1964 M. A. Altshuller
Fuel industry in the period of deployed construction of communism
1964 E. L. Gorokhovskii
On the inclusion of expenses for geological exploration works in the cost and prices of minerals
1964 Yu. V. Yakovets
Determination of labor intensity of coal mining
1964 M. V. Mordukhovich
Calculation of the cost of products obtained from complex loparite ores
1964 E. A. Pistsova
About the cost indicator of using the fixed assets of geological organizations
1964 A. M. Shibalova