Submit an Article
Become a reviewer
Vol 52 Iss. 1
Pages:
34-38
Download volume:
RUS
Article

Trenching speeds depending on ledge height and sinking methods

Authors:
S. Ya. Arsenyev
V. M. Prosochkin
Date submitted:
1965-07-04
Date accepted:
1965-09-13
Date published:
1966-07-26

Abstract

High trenching speeds are necessary to reduce construction time and increase the production capacity of open pits.During normal operation, the speed of trenching depends on the intensity of mining, the length of the mining front, the direction of front movement in relation to the occurrence of the ore body, the height and number of mining ledges that are in simultaneous mining, the width of working sites and other factors and can be determined by the ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 52

Similar articles

Influence of the charge diameter on the granite crushing degree
1966 A. A. Sashin
Experience of electrochemical strengthening of clayey rocks at quarries of Tikhvin alumina refinery.
1966 A. G. Khutashvili, V. N. Novozhilov
Determination of mining parameters for low-capacity ledge development by draglines (on the example of the Kingisepp phosphate deposit)
1966 I. M. Norkin
Transportation management at coal mines
1966 A. D. Shkolnikov
Research of parameters of open-cut mining of deposits with caving
1966 V. V. Golitsyn
Protection of constructions from the action of an air shock wave
1966 Yu. A. Yurmanov