Submit an Article
Become a reviewer
Vol 52 Iss. 1
Pages:
28-33
Download volume:
RUS
Article

Selection of parameters and efficiency of the panel mining system (on the example of the Kingisepp phosphate deposit).

Authors:
L. G. Tymovsky
I. M. Norkin
Date submitted:
1965-07-04
Date accepted:
1965-09-04
Date published:
1966-07-26

Abstract

When developing deposits by open pit method, the parameters of the panels are usually determined by the productivity of the quarry, the conditions of occurrence, the equipment used, the technology of excavation and transportation works, the qualitative composition of the mineral, the water content of the deposit and the method of draining it, the depth of frost and other factors ...

Область исследования:
(Archived) Without section
Go to volume 52

References

  1. Kinast F. Stripping transportation at lignite mines of the GDR. Mechanization of Labor-Intensive and HeavyWorks, No. 11, 1964.
  2. Rzhevskiy V. V., Anistratov Yu. I., Ilyin S. A. Open Mining Operations in Difficult Conditions. Nedra, 1964.
  3. Khokhryakov V. S. Designing and Organization of Work of Quarry Motor Transport. Gosgortekhizdat, 1963.

Similar articles

Determination of length and productivity of a mining block
1966 V. N. Sinkkovsky, N. D. Zolotarev
Experience of electrochemical strengthening of clayey rocks at quarries of Tikhvin alumina refinery.
1966 A. G. Khutashvili, V. N. Novozhilov
Operational management at open-cut mining works
1966 A. D. Shkolnikov
Determination of properties of explosives by the method of underwater explosion
1966 G. M. Golovin, N. A. Smirnov
About energy consumption in the near zone of explosion
1966 A. N. Khanukaev, K. A. Dolgov
Engineering-geological zoning for estimation of stability of rocks of quarry fields (on the example of Tikhvin mining district)
1966 V. N. Novozhilov