Selection of the mining system for two deposits in one open-pit field
Authors:
Abstract
The article considers variants of stripping opening and development systems with longitudinal preparation of the mining front in conditions of achieving the highest productivity of the open pit Aₚ. The calculations are based on the length of deposits Lₚ, their horizontal thickness t, the length lₑ and the number of blocks nb on the ledge, the annual productivity of the excavator Ab
Область исследования:
(Archived) Without section
Funding:
None
References
- Zolotarev N. D. Technology and economics of open-pit mining. Nedra, 1965a.
- Zolotarev N. D. Parameters of systems and technological indicators of complexity of open-pit mining. Gornyi zhurnal, No. 10, 1965.
Similar articles
Calculation of rods and flexible cable ties at artificial strengthening of rock slopes at quarries.
1966 M. A. Revazov, N. K. Zvonarev
Experience of electrochemical strengthening of clayey rocks at quarries of Tikhvin alumina refinery.
1966 A. G. Khutashvili, V. N. Novozhilov