Reversible method of ventilation of long dead-end mine workings of large cross-section after blasting operations
Abstract
Ventilation of hydraulic and transportation tunnels is complicated by a large cross-section of underground excavations, their considerable length and a large volume of blasting operations. Due to low air velocities in such excavations, the most common discharge method of ventilation does not provide rapid removal of harmful gases after blasting. Suction method of ventilation is also ineffective, as in the bottom-hole space is formed, a large volume of slow-moving air ...
Область исследования:
(Archived) Without section
References
- Mostepanov Yu. V. Aerodynamic similarity of streams at studying the processes of ventilation of mine workings. University Proc., Mining. Journal No. 5, 1966.
- Mostepanov Yu. B., Yakovlev Yu. A. Improvement of the electrical method of concentration measurement on the hydromodel in the study of ventilation of mine workings. Technology and Economics of Coal Mining, No. 11-12, 1965.
- Mostepanov Y. B., Kolbin A. A. I. Investigation of the processes of ventilation of dead-end mine workings of large cross-section. Design and Construction of Coal Enterprises, 2/98, 1967.
- Mustel P. I. Determination of partial ventilation fan performance, Mining Journal, No. 7-8, 1946.