Submit an Article
Become a reviewer
Vol 57 Iss. 1
Pages:
99-102
Download volume:
RUS
Article

Determination of the design load on the intermediate shot

Authors:
T. A. Ponomareva
Date submitted:
1968-07-28
Date accepted:
1968-09-25
Date published:
1969-01-13

Abstract

Despite the fact that nowadays lifting vessels are equipped with parachutes with brake ropes, there are still many mine lifting vessels equipped with parachutes, which, when triggered, capture the conductor.

Область исследования:
(Archived) Without section
Go to volume 57

Similar articles

Simplified method of measuring the loads on the vertical shaft support and displacements of the surrounding rock mass
1969 G. G. Mirzaev, V. D. Yagodkin, N. V. Semevskaya, Yu. S. Obruchev, V. L. Fedulin
Investigations of contouring borehole charge designs for vertical shaft sinking
1969 V. D. Fisunov
Estimation of rock fracturing in the zone of inelastic deformations
1969 V. B. Bokiy, A. I. Kudryashov, A. M. Fridlyand
Boris V. Bokii (70th anniversary of his birth)
1969 Redaktsionnaya Kollegiya
Estimation of mechanical properties of complex roof rocks in mines of the Leningrad oil shale deposit
1969 R. E. Dashko, Yu. F. Kuznetsov
Strengthening of coal massif by resinization
1969 I. G. Shelekhov