Submit an Article
Become a reviewer
Vol 57 Iss. 1
Pages:
99-102
Download volume:
RUS
Article

Determination of the design load on the intermediate shot

Authors:
T. A. Ponomareva
Date submitted:
1968-07-28
Date accepted:
1968-09-25
Date published:
1969-01-13

Abstract

Despite the fact that nowadays lifting vessels are equipped with parachutes with brake ropes, there are still many mine lifting vessels equipped with parachutes, which, when triggered, capture the conductor.

Область исследования:
(Archived) Without section
Go to volume 57

Similar articles

Bearing capacity of deep locks of wooden rods
1969 M. M. Mordukhovich, O. V. Timofeev
Determination of stresses in the massif near a fixed excavation with account of contour irregularities and creep of rocks
1969 A. G. Protosenya, V. A. Vashchilin
Estimation of mechanical properties of complex roof rocks in mines of the Leningrad oil shale deposit
1969 R. E. Dashko, Yu. F. Kuznetsov
Investigation of creep of some rocks
1969 Yu. F. Kuznetsov
Impact bending tests of rocks
1969 L. S. Burshtein
Application of direct current for hardening of rocks in mining excavations
1969 A. G. Khutashvili