Determination of the design load on the intermediate shot

Authors:
T. A. Ponomareva
Date submitted:
1968-07-28
Date accepted:
1968-09-25
Date published:
1969-01-13

Abstract

Despite the fact that nowadays lifting vessels are equipped with parachutes with brake ropes, there are still many mine lifting vessels equipped with parachutes, which, when triggered, capture the conductor.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 57

Similar articles

Investigation of creep of some rocks
1969 Yu. F. Kuznetsov
Estimation of rock fracturing in the zone of inelastic deformations
1969 V. B. Bokiy, A. I. Kudryashov, A. M. Fridlyand
Estimation of mechanical properties of complex roof rocks in mines of the Leningrad oil shale deposit
1969 R. E. Dashko, Yu. F. Kuznetsov
Determination of bearing capacity of the lock of a metal rod of a spacer type
1969 M. M. Mordukhovich
Calculation of cleaning chamber dimensions from the condition of stability limit of a layered roof fixed by a rod anchorage
1969 M. P. Markovich
Influence of cylindrical specimens height on tensile strength of oil shales
1969 T. A. Ponomareva