Submit an Article
Become a reviewer
Vol 57 Iss. 1
Pages:
95-98
Download volume:
RUS
Article

Economic efficiency of contour blasting during sinking of vertical shafts

Authors:
V. D. Fisunov
V. I. Smorodinov
N. N. Golovko
Date submitted:
1968-07-13
Date accepted:
1968-09-05
Date published:
1969-01-13

Abstract

Since 1966, the Leningrad Mining Institute together with Rostovshahtostroy Combine have been conducting research to determine the actual over-excavation of rock during the sinking of vertical shafts and to find the optimal parameters of contour blasting, contributing to the reduction of excessively excavated rock.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 57

Similar articles

Investigations of contouring borehole charge designs for vertical shaft sinking
1969 V. D. Fisunov
Investigation of the work of the reinforced concrete bar support
1969 G. G. Mirzaev
Determination of stresses in the massif near a fixed excavation with account of contour irregularities and creep of rocks
1969 A. G. Protosenya, V. A. Vashchilin
Estimation of mechanical properties of complex roof rocks in mines of the Leningrad oil shale deposit
1969 R. E. Dashko, Yu. F. Kuznetsov
Strengthening of coal massif by resinization
1969 I. G. Shelekhov
Investigation of stressed state of rocks around vertical excavations by photoelasticity method
1969 E. A. Zimina, E. N. Tarasenko