Submit an Article
Become a reviewer
Vol 57 Iss. 2
Pages:
139-140
Download volume:
RUS
Article

Estimation of economic efficiency of cooled air blowing during core drilling

Authors:
A. V. Golovkin
V. I. Kovalenko
V. K. Chistyakov
Date submitted:
1968-08-20
Date accepted:
1968-10-13
Date published:
1969-08-20

Abstract

Successful testing of technical means and technology of drilling wells with bottom-hole cleaning by cooled compressed air, developed by the department of TTBS of LGI under the contract with the Dalstroyproekt Institute (Magadan), allowed drilling by this method in production conditions and give a preliminary assessment of its economic efficiency in comparison with the method of drilling wells in frozen rocks “dry”, i.e. without bottom-hole cleaning by any circulating agent.

Область исследования:
(Archived) Without section
Go to volume 57

References

  1. Methodology for Determining the Economic Efficiency of New Geological Exploration Equipment. Gosgeoltekhizdat, Moscow, 1963.
  2. Reference Book of Estimated Norms for Geological Exploration Work on the items of basic costs, issue V. M., Gosgeoltekhizdat, 1960.

Similar articles

About well wall consolidation by continuous cement pipe string
1969 F. A. Shamshev, V. N. Sennikov, A. M. Yakovlev
High-frequency heating method and method of control over cement slurry hardening during well wall anchoring
1969 L. B. Nekrasov, A. M. Yakovlev
New methods of complications control in drilling wells and prospects of their application
1969 F. A. Shamshev, V. N. Sennikov, V. P. Neradov
Experience of diamond drilling with compressed air blowout
1969 Yu. M. Pariysky, L. K. Gorshkov, V. F. Fisenko
Experimental study of rock fracture process during rotary-impact drilling
1969 Yu. M. Pariysky
Calculation method of geometrical parameters of screw-drilling tips
1969 I. D. Hesse