Submit an Article
Become a reviewer
Vol 57 Iss. 2
Pages:
24-26
Download volume:
RUS
Article

About well wall consolidation by continuous cement pipe string

Authors:
F. A. Shamshev
V. N. Sennikov
A. M. Yakovlev
Date submitted:
1968-08-23
Date accepted:
1968-10-20
Date published:
1969-08-20

Abstract

In recent years, when drilling wells for water as a production string is increasingly used pipes are not steel, but from other, cheaper materials. At opening of mineralized waters refusal from application of steel pipes is a necessary condition for normal operation of wells. In this case asbestos-cement, plywood glued and plastic pipes are used for fixing well walls. At present the electrochemical method of well wall fixing is being mastered.

Область исследования:
(Archived) Without section
Go to volume 57

Similar articles

Calculation of tubular electrode and ohmic resistance at electrochemical well support
1969 V. N. Sennikov
Experimental study of rock fracture process during rotary-impact drilling
1969 Yu. M. Pariysky
Estimation of economic efficiency of cooled air blowing during core drilling
1969 A. V. Golovkin, V. I. Kovalenko, V. K. Chistyakov
Quick-setting mixtures for wells fixing in permafrost rocks
1969 F. A. Shamshev, A. M. Yakovlev
Normalization of borehole temperature regime when drilling through permafrost rocks with bottom-hole cleaning by air
1969 B. B. Kudryashov
Analysis, calculation and issues of regulation of the temperature regime of the borehole being drilled
1969 B. B. Kudryashov