Submit an Article
Become a reviewer
Vol 57 Iss. 2
Pages:
6-13
Download volume:
RUS
Article

New methods of complications control in drilling wells and prospects of their application

Authors:
F. A. Shamshev
V. N. Sennikov
V. P. Neradov
Date submitted:
1968-08-27
Date accepted:
1968-10-30
Date published:
1969-08-20

Abstract

Until recently, the main way to combat the loss of flushing fluid, well wall collapses in rocky rocks broken by tectonic fractures, was casing. But, as it is known, the use of casing pipes is associated with loss of diameters, so under difficult geological conditions, multi-column well designs are obtained and initial diameters are increased. This leads to additional complications, as the basic rule of drilling is violated: the smaller the diameter of wells, the less wall collapses and the more productive the work is, all other things being equal. Currently, this provision is generally accepted, in connection with which in all countries are moving in the exploration of solid minerals to drilling with drill bits d 46-59 mm in one-stage design of wells, ie, fix the upper unstable rocks pipes, and then drilling is carried out without casing.

Область исследования:
(Archived) Without section
Go to volume 57

Similar articles

Experimental study of rock fracture process during rotary-impact drilling
1969 Yu. M. Pariysky
Experience of diamond drilling with compressed air blowout
1969 Yu. M. Pariysky, L. K. Gorshkov, V. F. Fisenko
Calculation method of geometrical parameters of screw-drilling tips
1969 I. D. Hesse
Analysis, calculation and issues of regulation of the temperature regime of the borehole being drilled
1969 B. B. Kudryashov
Advantages of air as a circulating agent for drilling wells
1969 N. D. Mikhailova
Analysis of the temperature regime of drill bit diamonds
1969 L. K. Gorshkov, Yu. M. Pariysky