New methods of complications control in drilling wells and prospects of their application

Authors:
F. A. Shamshev
V. N. Sennikov
V. P. Neradov
Date submitted:
1968-08-27
Date accepted:
1968-10-30
Date published:
1969-08-20

Abstract

Until recently, the main way to combat the loss of flushing fluid, well wall collapses in rocky rocks broken by tectonic fractures, was casing. But, as it is known, the use of casing pipes is associated with loss of diameters, so under difficult geological conditions, multi-column well designs are obtained and initial diameters are increased. This leads to additional complications, as the basic rule of drilling is violated: the smaller the diameter of wells, the less wall collapses and the more productive the work is, all other things being equal. Currently, this provision is generally accepted, in connection with which in all countries are moving in the exploration of solid minerals to drilling with drill bits d 46-59 mm in one-stage design of wells, ie, fix the upper unstable rocks pipes, and then drilling is carried out without casing.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 57

Similar articles

Physical phenomena at destruction of hard rocks by blunting wedge cutter, complete formula of penetration rate and its application
1969 S. N. Tarakanov
Advantages of air as a circulating agent for drilling wells
1969 N. D. Mikhailova
Effective way to increase core yield and quality in frozen rocks
1969 B. B. Kudryashov, V. I. Kovalenko, V. K. Chistyakov, I. A. Baskilovich, P. M. Stepanov
Calculation of tubular electrode and ohmic resistance at electrochemical well support
1969 V. N. Sennikov
Calculation method of geometrical parameters of screw-drilling tips
1969 I. D. Hesse
Analysis of the temperature regime of drill bit diamonds
1969 L. K. Gorshkov, Yu. M. Pariysky