Calculation of quarry electrical loads

Authors:
A. S. Solovyev
Date submitted:
1965-07-16
Date accepted:
1965-09-24
Date published:
1966-11-15

Abstract

Estimated quarry electrical loads are mainly determined by the demand factor method Kd, i.e. the value of the estimated half-hourly load is determined by the expression …

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 53

References

  1. Alatortsev S. A. Rudnichnaya Electric Power Engineering of Surface Mining. Metallurgizdat, 1950.
  2. Volobrinsky S. D. et al. Electric loads of industrial enterprises. Energiya, 1964.
  3. Temporary Guidelines for Determination of Electric Loads of Industrial Enterprises. Gosenergoizdat, 1961.
  4. Gnedenko B. V. About one task of mass service. DAN Ukr. SSR, No. 5, 1958.
  5. Dlin A. M. Mathematical statistics in technology. Sovetskaya nauka, 1958.
  6. Kayalov G. M. Fundamentals of load analysis and calculation of networks of industrial enterprises. Elektrichestvo, No. 3, 1953.
  7. Methodical instructions for the survey of electrical loads of industrial enterprises. BTI ORGRES, 1964.
  8. Reference Book of Mining Electrical Engineering. Gosgortekhizdat, 1962.
  9. Turyshev B. F. Analysis and Methodology of Calculation of Electrical Loads at Open Mining Developments. V sb. Gornaya elektrotekhnika. Ugletekhizdat, 1957.
  10. Kharchev M. K. To the question about determination of electric loads of industrial enterprises. Promyshlennaya energetika, No. 7, 1957.

Similar articles

Mine tests of electrified mining machines
1966 Ya. P. Greenberg, M. D. Kolomiytsev
Energy performance of the asynchronous valve cascade for a mine hoist drive
1966 E. M. Proskuryakov
Regularities of load distribution of quarry traction substations and traction network sections
1966 V. A. Aleksandrov
Investigation of the process of switching transformers switching on through the longitudinal compensation unit
1966 V. G. Bauman, V. M. Kwiatkowski, O. V. Ivanov, B. I. Komarov, E. M. Proskuryakov
Damage to the quarry distribution network during blasting operations
1966 V. I. Bocharov
Wide-range generator for studying of high-frequency parameters of mine power networks
1966 V. I. Gvozdev, A. S. Soloviev