Ways to improve methods of mining valuable ore pillars

Authors:
Yu. I. Panenkov
V. F. Pryalukhin
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-27
Date accepted:
1968-09-25
Date published:
1969-05-05

Abstract

The Kaula copper-nickel deposit was developed in the upper part by open pit and in the lower part by underground mining with priority extraction of chamber reserves. Recently, the second stage of development - excavation of the remaining ore pillars - has been switched to. The deposit is represented by a stratum-shaped deposit with variable thickness and dip angle; the depth of occurrence is up to 400 meters (vertically). The strength of the ore is characterized by a coefficient of 8-12, and of the host rocks - 8-14 according to M. M. Protodyakonov.

Область исследования:
(Archived) Without section
Go to volume 58

Similar articles

Investigation of properties of injection solutions for reinforcing the embedment of cleaning chambers
1969 Yu. L. Minaev
Investigation of the influence of ore size on its flowing out
1969 L. F. Belichenko
Influence of concrete supports on bearing capacity of ore pillars under chamber mining systems
1969 V. P. Ushenin
Influence of heap wall reinforcement on heap strength
1969 Yu. A. Modestov
Possible causes of rock shoots in loose workings on the example of Khibiny apatite deposits
1969 V. I. Krapivin, A. G. Protosenya
Computer-aided selection of optimal parameters of blocks in caving development
1969 A. A. Kavtaskin