Ways to improve methods of mining valuable ore pillars

Authors:
Yu. I. Panenkov
V. F. Pryalukhin
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-27
Date accepted:
1968-09-25
Date published:
1969-05-05

Abstract

The Kaula copper-nickel deposit was developed in the upper part by open pit and in the lower part by underground mining with priority extraction of chamber reserves. Recently, the second stage of development - excavation of the remaining ore pillars - has been switched to. The deposit is represented by a stratum-shaped deposit with variable thickness and dip angle; the depth of occurrence is up to 400 meters (vertically). The strength of the ore is characterized by a coefficient of 8-12, and of the host rocks - 8-14 according to M. M. Protodyakonov.

Область исследования:
(Archived) Without section
Go to volume 58

Similar articles

Estimation of mutual influence of close cylindrical chambers
1969 V. S. Romanov
Investigation of properties of injection solutions for reinforcing the embedment of cleaning chambers
1969 Yu. L. Minaev
Peculiarities of influence of weak layers and ice on the stability of pillars
1969 V. G. Bezkaravayny, Yu. V. Shuvalov
Causes of losses of broken ore at Apatitovy mine
1969 Yu. N. Nikolaev, V. V. Shchipachev
To the question of underground horizons insulation at mines of Apatit Combine
1969 O. N. Rusak, Yu. N. Nikolaev
Excavation of barrier pillars during mining of ore fields by caving systems
1969 N. Z. Galaev