Ways to improve methods of mining valuable ore pillars

Authors:
Yu. I. Panenkov
V. F. Pryalukhin
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-27
Date accepted:
1968-09-25
Date published:
1969-05-05

Abstract

The Kaula copper-nickel deposit was developed in the upper part by open pit and in the lower part by underground mining with priority extraction of chamber reserves. Recently, the second stage of development - excavation of the remaining ore pillars - has been switched to. The deposit is represented by a stratum-shaped deposit with variable thickness and dip angle; the depth of occurrence is up to 400 meters (vertically). The strength of the ore is characterized by a coefficient of 8-12, and of the host rocks - 8-14 according to M. M. Protodyakonov.

Область исследования:
(Archived) Without section
Go to volume 58

Similar articles

Estimation of mutual influence of close cylindrical chambers
1969 V. S. Romanov
Experience of inter-chamber pillar mining after consolidation of the primary chambers' backfill
1969 Yu. L. Minaev, A. V. Karpunin, A. G. Vasiliev
Investigation of bearing pressure at different order of block excavation in a floor (for conditions of mining of lower horizons of Kirovsky mine of Apatit Combine)
1969 N. Z. Galaev, G. G. Milekhin
Calculation of limit spans of unshored frozen roofs
1969 Yu. V. Shuvalov
Investigation of the influence of complex hypsometry of the ore body on the value of ore loss and dilution
1969 A. I. Shablygin, V. G. Eliseev
Possible causes of rock shoots in loose workings on the example of Khibiny apatite deposits
1969 V. I. Krapivin, A. G. Protosenya