Ways to improve methods of mining valuable ore pillars

Authors:
Yu. I. Panenkov
V. F. Pryalukhin
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-27
Date accepted:
1968-09-25
Date published:
1969-05-05

Abstract

The Kaula copper-nickel deposit was developed in the upper part by open pit and in the lower part by underground mining with priority extraction of chamber reserves. Recently, the second stage of development - excavation of the remaining ore pillars - has been switched to. The deposit is represented by a stratum-shaped deposit with variable thickness and dip angle; the depth of occurrence is up to 400 meters (vertically). The strength of the ore is characterized by a coefficient of 8-12, and of the host rocks - 8-14 according to M. M. Protodyakonov.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 58

Similar articles

Economic assessment of damage from losses and dilution during development of rich ores
1969 P. G. Makulov
Investigation of the stressed state of pillars under the chamber-pillar system of development at the Mayak mine
1969 V. D. Paliy, Yu. D. Orlov, V. P. Ushenin
Prof. Vladimir N. Semevsky (1898-1968)
1969 A. I. Shablygin, N. Z. Galaev, Yu. I. Panenkov
Investigation of bearing pressure at different order of block excavation in a floor (for conditions of mining of lower horizons of Kirovsky mine of Apatit Combine)
1969 N. Z. Galaev, G. G. Milekhin
Possible causes of rock shoots in loose workings on the example of Khibiny apatite deposits
1969 V. I. Krapivin, A. G. Protosenya
Estimation of mutual influence of close cylindrical chambers
1969 V. S. Romanov