Ways to improve methods of mining valuable ore pillars

Authors:
Yu. I. Panenkov
V. F. Pryalukhin
Yu. L. Minaev
A. V. Karpunin
A. G. Vasiliev
Date submitted:
1968-07-27
Date accepted:
1968-09-25
Date published:
1969-05-05

Abstract

The Kaula copper‑nickel deposit was developed in the upper part by open pit and in the lower part by underground mining with priority extraction of chamber reserves. Recently, a transition has been made to the second stage of development – extraction of the remaining ore pillars. The deposit is represented by a stratiform body with variable thickness and dip angle; the depth of occurrence is up to 400 m (vertically). The strength of the ore is characterized by a coefficient of 8‑12, and of the host rocks – 8‑14 according to M. M. Protodyakonov.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 58

Similar articles

Investigation of the stressed state of pillars under the chamber-pillar system of development at the Mayak mine
1969 V. D. Paliy, Yu. D. Orlov, V. P. Ushenin
Prof. Vladimir N. Semevsky (1898-1968)
1969 A. I. Shablygin, N. Z. Galaev, Yu. I. Panenkov
Physical and mechanical properties of solidifying fill in artificial pillars
1969 T. N. Smirnova
Influence of heap pillar wall reinforcement on heap pillar strength
1969 Yu. A. Modestov
Investigation of bearing pressure at different order of block excavation in a floor (for conditions of mining of lower horizons of Kirovsky mine of Apatit Combine)
1969 N. Z. Galaev, G. G. Milekhin
Causes of losses of broken ore at Apatitovy mine
1969 Yu. N. Nikolaev, V. V. Shchipachev