Testing of the PK-7 combine at the mine No. 3 of the Leningradslanets Trust.

Authors:
M. D. Kolomiitsov
Date submitted:
1966-07-18
Date accepted:
1966-09-26
Date published:
1967-09-21

Abstract

The tests were carried out in 1965 to determine the efficiency of destruction of layers of industrial oil shale stack by the executive body of the combine, which is a milling-type cutting crown. The rotation speed of the crown is 58 r/min from the electric motor KOF‑22‑4k (25 kW). Rotation of the crown in vertical and horizontal planes and feed back and forth (0.5 m) are carried out by hydraulic cylinders. Two hydraulic jacks provide the combine's support between the roof and the floor. The hydraulic jack pumps are driven by the second electric motor KOF‑22‑4k. Thus, the total installed power of the motors for rotation and feeding of the crown is 50 kW.

Область исследования:
(Archived) Information on scientific works of the Leningrad Mining Institute
Funding:

None

Go to volume 54

Similar articles

Influence of drill bit design on drilling cost (with SVB-2 machines at the Estonslanets field)
1967 A. I. Talko, R. M. Petrov, E. A. Vaher
Tests of the Ural-33 shearer during limestone undercutting.
1967 I. F. Bobrov, Ya. P. Greenberg
Fundamentals of the theory of the static-acting swarm operation and determination of its productivity
1967 G. A. Nedoluzhenko
Selection of three-phase current electric drive for pneumatic wheeled self-propelled cars
1967 I. I. Margolin
Ore transportation through deep ore passes
1967 V. I. Gerontiev, A. M. Factorovich, L. G. Tymovsky, O. D. Serebrennikov
Modeling of work of the operation of railway transport of in open-pit coal mines
1967 V. M. Popkov, A. D. Shkolnikov