Submit an Article
Become a reviewer
Vol 54 Iss. 1
Pages:
130-133
Download volume:
RUS
Article

Testing of the PK-7 combine at the mine No. 3 of the Leningradslanets Trust.

Authors:
M. D. Kolomiitsov
Date submitted:
1966-07-18
Date accepted:
1966-09-26
Date published:
1967-09-21

Abstract

The tests were carried out in 1965 to determine the efficiency of destruction of layers of industrial oil shale stack by the executive body of the combine, which is a milling-type rebound crown. The rotation speed of the crown is 58 r/min from the electric motor KOF-22-4k (25 kW). Rotation of the crown in the vertical, horizontal planes and feed back and forth (0,5 m) are carried out by hydraulic cylinders. Two hydraulic jacks provide the harvester's support between the roof and the soil. The hydraulic jack pumps are driven by the second electric motor KOF-22-4k. Thus, the total installed power of the motors for rotation and feeding of the crown is 50 kW ...

Область исследования:
(Archived) Information on scientific works of the Leningrad Mining Institute
Go to volume 54

Similar articles

Calculation of the mode of braking of a broken mine stand by a jet parachute
1967 R. E. Rogulin
Resistance of oil shale layers to mechanical fracture
1967 I. F. Bobrov, M. D. Kolomiitsov, Ya. P. Lukoshkov, V. E. Rosenkevich
Measurement of hydro-mixture density by radioisotope density meter PZHR-2M
1967 V. N. Pokrovskaya, Yu. P. Boytsov, D. G. Povolotsky
Ways to increase the utilization of locomotive-car fleet of Apatit Combine
1967 L. G. Tymovsky, G. V. Dubovitsky
Impact interaction of a load with a conveyor belt
1967 V. M. Goikhman
Tests of the Ural-33 shearer during limestone undercutting.
1967 I. F. Bobrov, Ya. P. Greenberg