Fundamentals of the theory of the static-acting swarm operation and determination of its productivity

Authors:
G. A. Nedoluzhenko
Date submitted:
1966-07-03
Date accepted:
1966-09-29
Date published:
1967-09-21

Abstract

Stringer, which is the executive body of the string plant, is usually used on the declining coal seams (0-20°) with a thickness of 0,9-1,8 m with soft and medium hard coal. The stringline operates according to the shallow scheme, moving along the face at a speed of 33.6 m/min and higher. On the body of the screed are mounted soil advance and lower knives and cutters, which work in conditions of blocked and semi-blocked cutting ...

Область исследования:
(Archived) Without section
Go to volume 54

References

  1. Demidov P. N. et al. Coal jets. Gosgortekhizdat, 1962.
  2. Melyushchev A. G. et al. Tests of the high-speed strog Westphal-Lunen in Donbass. In the collection of CITI, No. 8, 1959.
  3. Filimonov N. A. Mine and sinking mining machines. Uglegletehizdat, 1958.

Similar articles

Feeding mechanism of “Ural-33” rotary hammering machine driven by a serial engine
1967 Ya. P. Greenberg, V. E. Rozenkiewicz
To the theory of vibro-loading machines
1967 P. A. Zhuravlev, A. F. Zakharevich
Pipe wear depending on hydraulic conveying parameters
1967 V. N. Pokrovskaya
Modeling of work of railway transport of coal mines
1967 V. M. Popkov, A. D. Shkolnikov
Tests of the Ural-33 shearer during limestone undercutting.
1967 I. F. Bobrov, Ya. P. Greenberg
Investigation of the main methods of conveyor belt cleaning
1967 A. M. Factorovich, O. D. Serebrennikov, L. G. Tymovsky, A. V. А. V. Rys'ev