Methodology of calculation of loads on artificial pillars

Authors:
A. A. Borisov
S. N. Suglobov
Date submitted:
1971-07-22
Date accepted:
1971-09-18
Date published:
1972-05-26

Abstract

Room-and-pillar systems of development with cemented backfill are becoming more and more widespread. This causes the need for further development of calculation methods for determining the basic parameters of the systems and strength properties of the backfill. The purpose of such calculations is a reasonable choice of the width of inter-chamber pillars, chamber spans, width of a panel or block, dimensions of inter-block (panel) pillars, determination of the required strength of artificial pillars. The results of calculations, of course, will be different depending on the order of development of sections (blocks), chambers within one block, the structure and properties of the filling massif and other conditions.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 61

References

  1. Volkhin B. A. et al. Justification of the parameters of development systems with the use of solidifying backfill. Gornyi zhurnal, 1970, No. 6. (in Russian)
  2. Lysenko I. Z., Zhukovich I. E., Radenko E. S. Determination of Basic Parameters of Panel-Pillar System with Artificial Pliable Supports in Conditions of Dzhezkazgan Mines. Sb. "Usovershenstvovanie tekhnologii dobychi rud Kazakhstana". Tr. IGD AN KazSSR, vol. 21, 1966. (in Russian)
  3. Modestov Yu. A. Joint calculation of interchamber and interblock (barrier) pillars in the development of bedded deposits. Sb. "Metody opredeleniya razmerov opornykh tselikov i potolochin". Izd. AN SSSR, 1962. (in Russian)
  4. Ushenin V. P. Determination of loads on ore and artificial pillars during mining of hollow deposits with concrete and hardening filling. Sb. "Novye issledovaniya v gornom dele". Izd. LGI, 1969. (in Russian)

Similar articles

Complex-mechanized development of thick steep seams with stowing
1972 E. Ya. Makhno
Fundamentals of the methodology of the for systematic control of roof lowering in mine subsidence in longwall faces
1972 M. A. Borisova
Determination of the dimensions of the inelastic deformation zone around a supported opening subjected to abutment pressure
1972 A. G. Protosenya
Methods of experimental study of the stress state of rock masses and reinforced concrete support elements
1972 Yu. S. Obruchev, G. G. Mirzaev, G. A. Ashimov
Improvement of the method of measuring the rock pressure in models
1972 S. N. Suglobov, V. L. Fedulin, V. D. Yagodkin
On the possibility of reducing the solution of the doubly connected problem of mutual influence of two mine workings to a singly connected one
1972 A. G. Protosenya